Key facts

Capacity
99 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
February 2012First generator online
Operator
NexteraEnergyEIA operator ID 64421
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Coos County, NH44.7044, −71.2925
EIA plant ID
58004EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Granite Reliable Power produces

Free · EIA-923

Net generation, 2025

193 GWh

193,139 MWh, final

Capacity factor, 2025

22.3%

2024: 21.7%

January to July 2026

124 GWh

Provisional

Range, 2015 to 2025

173.3–240.6

GWh a year. Low 2023, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012138,729Not reported11 of 12
2013222,03125.6%12 of 12
2014236,52627.3%12 of 12
2015240,61727.7%12 of 12
2016215,46624.8%12 of 12
2017207,76924.0%12 of 12
2018214,23724.7%12 of 12
2019233,01026.9%12 of 12
2020235,33427.1%12 of 12
2021225,56226.0%12 of 12
2022206,38223.8%12 of 12
2023173,25220.0%12 of 12
2024189,11821.7%12 of 12
2025193,13922.3%12 of 12
2026 (provisional, partial year)124,25224.7%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine99.0February 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists NexteraEnergy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Granite Reliable Power and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Granite Reliable Power

Questions about Granite Reliable Power

How much power does Granite Reliable Power produce?

Granite Reliable Power reported 193,139 MWh (193 GWh) of net generation in 2025, a 22.3% capacity factor on 99 MW of nameplate capacity. From January to July 2026 it reported 124 GWh, which is provisional.

Where is Granite Reliable Power?

Granite Reliable Power is in Coos County, New Hampshire, at 44.7044, −71.2925. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Granite Reliable Power?

EIA-860M for August 2026 lists NexteraEnergy as the operator (EIA operator ID 64421). The operator is not always the owner.

When did Granite Reliable Power start operating?

Its first generator began operating in February 2012, according to EIA-860M.

Does InfraMap have power prices for Granite Reliable Power?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Granite Reliable Power, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05