Natural gasSolarBattery storageOperatingMISO

Marshalltown Generating Station

Natural gas project in Marshall County, Iowa. 708.8 MW of nameplate capacity across 5 generators, operated by Interstate Power and Light Co.

Also known as EIA plant 58236

This project groups Marshalltown Generating Station (EIA 58236). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Vienna Wind FarmLaurel Wind FarmState CenterSalt Creek WindIvester Wind FarmMarshalltown20 km
Open in the map
6 plants within 33 km, from EIA coordinates.

Key facts

Capacity
708.8 MWNatural gas 705.9 · Solar 2.6 · Battery storage 0.3
Generators
5 operatingEIA-860M, August 2026
Operating since
April 2017First generator online
Operator
Interstate Power and Light CoEIA operator ID 9417
Grid
MISOBalancing authority MISO
Price nodes
6 MISO nodesResource nodes with prices
Location
Marshall County, IA42.0433, −92.8728
EIA plant ID
58236EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Marshalltown produces

Free · EIA-923

Net generation, 2025

3.18 TWh

3,177,931 MWh, final

Capacity factor, 2025

51.2%

2024: Not reported

January to July 2026

1.57 TWh

Provisional

Range, 2018 to 2025

1.9–3.8

TWh a year. Low 2021, high 2019

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
20171,307,62829.1%9 of 12
20183,028,82549.0%12 of 12
20193,761,07860.8%12 of 12
2020671,124Not reported3 of 12
20211,921,67531.0%12 of 12
20222,724,00243.9%12 of 12
20233,581,96657.7%12 of 12
20243,498,948Not reported12 of 12
20253,177,93151.2%12 of 12
2026 (provisional, partial year)1,568,22743.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1.39M

US short tons. 2024: 1.57M

SO₂, 2025

7

US short tons

NOx, 2025

85

US short tons

CO₂ per MWh, calculated

0.44 t

About 878 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (CT1, CT2), matched to EIA plant 58236 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

657

million gallons

Consumption, 2024

595

million gallons

Source

Marshalltown Water Works

Ground, Fresh. Induced-draft tower

Watershed stress

Low · 0.231

USGS SUI, HUC12 Timber Creek

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BESS1Batteries0.3October 2020
CTG1Natural Gas Fired Combined Cycle222.7April 2017
CTG2Natural Gas Fired Combined Cycle222.7April 2017
PV1Solar Photovoltaic2.6February 2020
STG1Natural Gas Fired Combined Cycle260.5April 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Interstate Power and Light Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Marshalltown Generating Station and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Marshalltown

More plants operated by Interstate Power and Light Co

Questions about Marshalltown

How much power does Marshalltown Generating Station produce?

Marshalltown Generating Station reported 3,177,931 MWh (3.18 TWh) of net generation in 2025, a 51.2% capacity factor on 708.8 MW of nameplate capacity. From January to July 2026 it reported 1.57 TWh, which is provisional.

Where is Marshalltown Generating Station?

Marshalltown Generating Station is in Marshall County, Iowa, at 42.0433, −92.8728. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Marshalltown Generating Station?

EIA-860M for August 2026 lists Interstate Power and Light Co as the operator (EIA operator ID 9417). The operator is not always the owner.

When did Marshalltown Generating Station start operating?

Its first generator began operating in April 2017, according to EIA-860M.

Does InfraMap have power prices for Marshalltown Generating Station?

Yes. InfraMap has MISO day-ahead and real-time prices at 6 price nodes linked to Marshalltown Generating Station, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page