McCoy Solar Energy Project Hybrid

Solar and battery storage project in Riverside County, California. 500.6 MW of nameplate capacity across 9 generators, operated by McCoy Solar, LLC.

Also known as EIA plant 58462

This project groups McCoy Solar Energy Project Hybrid (EIA 58462). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Blythe Solar II, LLCMcCoy Solar Energy Pr…2 km
Open in the map
6 plants within 4.3 km, from EIA coordinates.

Key facts

Capacity
500.6 MWSolar 270.6 · Battery storage 230.0
Generators
9 operatingEIA-860M, August 2026
Operating since
August 2015First generator online
Operator
McCoy Solar, LLCEIA operator ID 58451
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Riverside County, CA33.6947, −114.7397
EIA plant ID
58462EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power McCoy Solar Energy Project Hybrid produces

Free · EIA-923

Net generation, 2025

639 GWh

638,685 MWh, final

Capacity factor, 2025

29.1%

2024: 28.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2016 to 2025

524.7–745.2

GWh a year. Low 2023, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
201574,59125.9%5 of 12
2016694,37832.1%12 of 12
2017745,18631.4%12 of 12
2018700,90729.6%12 of 12
2019721,33930.4%12 of 12
2020569,16123.9%12 of 12
2021278,619Not reported6 of 12
2022646,98028.5%12 of 12
2023524,67925.7%12 of 12
2024646,70628.1%12 of 12
2025638,68529.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Solar Photovoltaic41.9March 2016
BLK2Solar Photovoltaic21.0April 2016
BLK3Solar Photovoltaic39.6June 2016
BLK4Solar Photovoltaic31.4September 2015
BLK5Solar Photovoltaic31.4November 2015
BLK6Solar Photovoltaic26.9December 2015
BLK7Solar Photovoltaic41.9January 2016
BLK8Solar Photovoltaic36.5August 2015
MCST1Batteries230.0July 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists McCoy Solar, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query McCoy Solar Energy Project Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near McCoy Solar Energy Project Hybrid

Questions about McCoy Solar Energy Project Hybrid

How much power does McCoy Solar Energy Project Hybrid produce?

McCoy Solar Energy Project Hybrid reported 638,685 MWh (639 GWh) of net generation in 2025, a 29.1% capacity factor on 500.6 MW of nameplate capacity.

Where is McCoy Solar Energy Project Hybrid?

McCoy Solar Energy Project Hybrid is in Riverside County, California, at 33.6947, −114.7397. It is in the California Independent System Operator balancing area (CISO).

Who operates McCoy Solar Energy Project Hybrid?

EIA-860M for August 2026 lists McCoy Solar, LLC as the operator (EIA operator ID 58451). The operator is not always the owner.

Is McCoy Solar Energy Project Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 270.6 MW and battery storage capacity totals 230 MW.

When did McCoy Solar Energy Project Hybrid start operating?

Its first generator began operating in August 2015, according to EIA-860M.

Does InfraMap have power prices for McCoy Solar Energy Project Hybrid?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to McCoy Solar Energy Project Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page