SolarBattery storageOperatingCAISO

Blythe Solar II, LLC

Solar and battery storage project in Riverside County, California. 246.2 MW of nameplate capacity across 5 generators, operated by Blythe Solar II, LLC.

Also known as EIA plant 60092

This project groups Blythe Solar II, LLC (EIA 60092). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

McCoy Solar Energy Project HybridBlythe Solar III, LLC HybridArlington Energy Center IIBlythe Solar II2 km
Open in the map
6 plants within 4.3 km, from EIA coordinates.

Key facts

Capacity
246.2 MWSolar 131.2 · Battery storage 115.0
Generators
5 operatingEIA-860M, August 2026
Operating since
July 2016First generator online
Operator
Blythe Solar II, LLCEIA operator ID 59843
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
Riverside County, CA33.6800, −114.7300
EIA plant ID
60092EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Blythe Solar II produces

Free · EIA-923

Net generation, 2025

337 GWh

336,977 MWh, final

Capacity factor, 2025

30.6%

2024: 29.8%

January to July 2026

204 GWh

Provisional

Range, 2017 to 2025

272.3–349.1

GWh a year. Low 2019, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016101,51020.5%6 of 12
2017349,06730.4%12 of 12
2018345,08630.0%12 of 12
2019272,28223.7%12 of 12
2020277,44524.1%12 of 12
2021270,397Not reported10 of 12
2022334,18530.4%12 of 12
2023311,91428.1%12 of 12
2024334,05529.8%12 of 12
2025336,97730.6%12 of 12
2026 (provisional, partial year)204,35332.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BLCK4Solar Photovoltaic33.2July 2016
BLCK5Solar Photovoltaic33.9August 2016
BLCK6Solar Photovoltaic32.0September 2016
BLCK7Solar Photovoltaic32.1October 2016
BLST2Batteries115.0March 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Blythe Solar II, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Blythe Solar II, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Blythe Solar II

Questions about Blythe Solar II

How much power does Blythe Solar II, LLC produce?

Blythe Solar II, LLC reported 336,977 MWh (337 GWh) of net generation in 2025, a 30.6% capacity factor on 246.2 MW of nameplate capacity. From January to July 2026 it reported 204 GWh, which is provisional.

Where is Blythe Solar II, LLC?

Blythe Solar II, LLC is in Riverside County, California, at 33.6800, −114.7300. It is in the California Independent System Operator balancing area (CISO).

Who operates Blythe Solar II, LLC?

EIA-860M for August 2026 lists Blythe Solar II, LLC as the operator (EIA operator ID 59843). The operator is not always the owner.

Is Blythe Solar II, LLC a solar or a battery storage plant?

Both. Solar capacity totals 131.2 MW and battery storage capacity totals 115 MW.

When did Blythe Solar II, LLC start operating?

Its first generator began operating in July 2016, according to EIA-860M.

Does InfraMap have power prices for Blythe Solar II, LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Blythe Solar II, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page