Natural gasOperatingPJM

Middletown Energy Center

Natural gas power plant in Butler County, Ohio. 543.9 MW of nameplate capacity across 2 generators, operated by Ohio Power Partners, LLC.

Also known as EIA plant 59326

Analyst: free account, 1 question a day.

Dick's CreekCZ Solar Warren, LLCWoodsdaleMiddletown5 km
Open in the map
5 plants within 10 km, from EIA coordinates.

Key facts

Capacity
543.9 MWNameplate
Generators
2 operatingEIA-860M, August 2026
Operating since
May 2018First generator online
Operator
Ohio Power Partners, LLCEIA operator ID 59124
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Butler County, OH39.4650, −84.3478
EIA plant ID
59326EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Middletown produces

Free · EIA-923

Net generation, 2025

3.14 TWh

3,144,914 MWh, final

Capacity factor, 2025

66.0%

2024: 75.6%

January to July 2026

2.05 TWh

Provisional

Range, 2019 to 2025

3.1–3.6

TWh a year. Low 2025, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
20182,255,806Not reported11 of 12
20193,329,49669.9%12 of 12
20203,386,13970.9%12 of 12
20212,685,17961.6%11 of 12
20223,556,46174.6%12 of 12
20233,363,08670.6%12 of 12
20243,612,50575.6%12 of 12
20253,144,91466.0%12 of 12
2026 (provisional, partial year)2,052,30474.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

1.24M

US short tons. 2024: 1.44M

SO₂, 2025

6

US short tons

NOx, 2025

63

US short tons

CO₂ per MWh, calculated

0.39 t

About 789 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 59326 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

705

million gallons

Consumption, 2024

577

million gallons

Source

Municipality

Ground, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.195

USGS SUI, HUC12 Shaker Creek

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
MEC1Natural Gas Fired Combined Cycle310.2May 2018
MEC2Natural Gas Fired Combined Cycle233.7May 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Ohio Power Partners, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Middletown Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Middletown

Questions about Middletown

How much power does Middletown Energy Center produce?

Middletown Energy Center reported 3,144,914 MWh (3.14 TWh) of net generation in 2025, a 66.0% capacity factor on 543.9 MW of nameplate capacity. From January to July 2026 it reported 2.05 TWh, which is provisional.

Where is Middletown Energy Center?

Middletown Energy Center is in Butler County, Ohio, at 39.4650, −84.3478. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Middletown Energy Center?

EIA-860M for August 2026 lists Ohio Power Partners, LLC as the operator (EIA operator ID 59124). The operator is not always the owner.

When did Middletown Energy Center start operating?

Its first generator began operating in May 2018, according to EIA-860M.

Does InfraMap have power prices for Middletown Energy Center?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Middletown Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page