NuclearOperatingPJM

Perry

Nuclear power plant in Lake County, Ohio. 1,311.6 MW of nameplate capacity across 1 generator, operated by Energy Harbor Nuclear Generation LLC.

Also known as Perry Nuclear Power Plant · EIA plant 6020

Analyst: free account, 1 question a day.

PainesvilleGenevaAshtabulaEuclid Farm, Stamco N-54Cleveland PeakingPerry25 km
Open in the map
6 plants within 46 km, from EIA coordinates.

Key facts

Capacity
1,311.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 1987First generator online
Operator
Energy Harbor Nuclear Generation LLCEIA operator ID 64225
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Lake County, OH41.8006, −81.1439
EIA plant ID
6020EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Perry produces

Free · EIA-923

Net generation, 2025

9.35 TWh

9,349,983 MWh, final

Capacity factor, 2025

81.4%

2024: 91.8%

January to July 2026

6.27 TWh

Provisional

Range, 2015 to 2025

8.2–11.0

TWh a year. Low 2023, high 2020

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200010,085,677Not reported12 of 12
20017,779,444Not reported12 of 12
20029,974,810Not reported12 of 12
20038,545,176Not reported12 of 12
200410,227,326Not reported12 of 12
20057,646,648Not reported12 of 12
200610,475,373Not reported12 of 12
20078,058,247Not reported12 of 12
200810,690,593Not reported12 of 12
20097,596,472Not reported12 of 12
201010,619,71192.4%12 of 12
20118,560,84974.5%12 of 12
20129,973,10686.6%12 of 12
20138,441,422Not reported12 of 12
201410,455,27191.0%12 of 12
20159,482,84582.5%12 of 12
201610,423,25090.5%12 of 12
20179,812,37685.4%12 of 12
201810,934,73695.2%12 of 12
20199,173,10279.8%12 of 12
202010,990,96295.4%12 of 12
20219,703,86884.5%12 of 12
202210,334,45489.9%12 of 12
20238,220,91271.6%12 of 12
202410,578,86391.8%12 of 12
20259,349,98381.4%12 of 12
2026 (provisional, partial year)6,268,87393.9%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

30,476

million gallons

Consumption, 2024

7,254

million gallons

Source

LAKE ERIE

Surface, Fresh. Natural-draft tower

Watershed stress

Moderate · 0.536

USGS SUI, HUC12 McKinley Creek-Frontal Lake Erie

12 of 12 cooling months report withdrawal. Great Lakes intake; a shoreline HUC12 does not describe the lake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Nuclear1,311.6November 1987

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Energy Harbor Nuclear Generation LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Perry and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Perry

More plants operated by Energy Harbor Nuclear Generation LLC

Questions about Perry

How much power does Perry produce?

Perry reported 9,349,983 MWh (9.35 TWh) of net generation in 2025, a 81.4% capacity factor on 1,311.6 MW of nameplate capacity. From January to July 2026 it reported 6.27 TWh, which is provisional.

Where is Perry?

Perry is in Lake County, Ohio, at 41.8006, −81.1439. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Perry?

EIA-860M for August 2026 lists Energy Harbor Nuclear Generation LLC as the operator (EIA operator ID 64225). The operator is not always the owner.

When did Perry start operating?

Its first generator began operating in November 1987, according to EIA-860M.

Does InfraMap have power prices for Perry?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Perry, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page