Solar Star California, XLI, LLC

Solar power plant in Kern County, California. 54 MW of nameplate capacity across 1 generator, operated by MN8 Energy LLC.

Also known as EIA plant 60591

Analyst: free account, 1 question a day.

Rosamond South 1Golden Field Solar III, LLCNorth Rosamond Solar LLCSolar Star 1Solar Star California, XLI1 km
Open in the map
6 plants within 3.3 km, from EIA coordinates.

Key facts

Capacity
54 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2016First generator online
Operator
MN8 Energy LLCEIA operator ID 61944
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Kern County, CA34.8390, −118.3868
EIA plant ID
60591EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Solar Star California, XLI produces

Free · EIA-923

Net generation, 2025

147 GWh

147,197 MWh, final

Capacity factor, 2025

31.1%

2024: 31.3%

January to July 2026

83.7 GWh

Provisional

Range, 2017 to 2025

110.5–156.9

GWh a year. Low 2021, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
201615,428Not reported3 of 12
2017151,68032.1%12 of 12
2018156,85733.2%12 of 12
2019155,72932.9%12 of 12
2020118,51725.0%12 of 12
2021110,49123.4%12 of 12
2022156,48533.1%12 of 12
2023146,80331.0%12 of 12
2024148,25431.3%12 of 12
2025147,19731.1%12 of 12
2026 (provisional, partial year)83,66730.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
RS1Solar Photovoltaic54.0December 2016

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MN8 Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Solar Star California, XLI, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Solar Star California, XLI

More plants operated by MN8 Energy LLC

Questions about Solar Star California, XLI

How much power does Solar Star California, XLI, LLC produce?

Solar Star California, XLI, LLC reported 147,197 MWh (147 GWh) of net generation in 2025, a 31.1% capacity factor on 54 MW of nameplate capacity. From January to July 2026 it reported 83.7 GWh, which is provisional.

Where is Solar Star California, XLI, LLC?

Solar Star California, XLI, LLC is in Kern County, California, at 34.8390, −118.3868. It is in the California Independent System Operator balancing area (CISO).

Who operates Solar Star California, XLI, LLC?

EIA-860M for August 2026 lists MN8 Energy LLC as the operator (EIA operator ID 61944). The operator is not always the owner.

When did Solar Star California, XLI, LLC start operating?

Its first generator began operating in December 2016, according to EIA-860M.

Does InfraMap have power prices for Solar Star California, XLI, LLC?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Solar Star California, XLI, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page