Natural gasOperatingFPL

Cape Canaveral

Natural gas power plant in Brevard County, Florida. 1,295 MW of nameplate capacity across 4 generators, operated by Florida Power & Light Co.

Also known as Cape Canaveral Power Plant · EIA plant 609

Analyst: free account, 1 question a day.

Indian River PlantSpace Coast Next Gen…Discovery Solar CenterBrevardOleander Power Project LPCape Canaveral5 km
Open in the map
5 plants within 12 km, from EIA coordinates.

Key facts

Capacity
1,295 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
April 2013First generator online
Operator
Florida Power & Light CoEIA operator ID 6452
Grid
FPLBalancing authority FPL
Price nodes
None linkedNo verified ISO node
Location
Brevard County, FL28.4698, −80.7644
EIA plant ID
609EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Cape Canaveral produces

Free · EIA-923

Net generation, 2025

6.96 TWh

6,960,999 MWh, final

Capacity factor, 2025

61.4%

2024: 57.4%

January to July 2026

4.50 TWh

Provisional

Range, 2015 to 2025

5.4–7.4

TWh a year. Low 2022, high 2018

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20003,321,773Not reported12 of 12
20013,833,694Not reported12 of 12
20023,257,614Not reported12 of 12
20033,425,885Not reported12 of 12
20042,618,365Not reported12 of 12
20052,472,950Not reported12 of 12
20062,025,417Not reported12 of 12
20072,038,009Not reported12 of 12
20081,233,347Not reported12 of 12
20091,597,709Not reported12 of 12
2010290,9724.1%12 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013357,15238.3%1 of 12
20146,845,35560.3%12 of 12
20157,046,07962.1%12 of 12
20166,713,24559.0%12 of 12
20176,942,85661.2%12 of 12
20187,414,487Not reported12 of 12
20196,676,862Not reported12 of 12
20206,378,35756.1%12 of 12
20215,970,43852.6%12 of 12
20225,358,68147.2%12 of 12
20237,119,14462.8%12 of 12
20246,525,90857.4%12 of 12
20256,960,99961.4%12 of 12
2026 (provisional, partial year)4,495,28368.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.84M

US short tons. 2024: 2.63M

SO₂, 2025

14

US short tons

NOx, 2025

181

US short tons

CO₂ per MWh, calculated

0.41 t

About 817 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (CCCT3A, CCCT3B, CCCT3C, PCC1, PCC2), matched to EIA plant 609 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

172,478

million gallons

Consumption, 2024

Not reported

million gallons

Source

Indian River

Surface, Saline. Once-through

Watershed stress

Very low/none · 0.172

USGS SUI, HUC12 Indian River Lagoon

12 of 12 cooling months report withdrawal. Saline, brackish or ocean intake; not tested. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
3ANatural Gas Fired Combined Cycle265.0April 2013
3BNatural Gas Fired Combined Cycle265.0April 2013
3CNatural Gas Fired Combined Cycle265.0April 2013
3STNatural Gas Fired Combined Cycle500.0April 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Florida Power & Light Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Cape Canaveral and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Cape Canaveral

More plants operated by Florida Power & Light Co

Questions about Cape Canaveral

How much power does Cape Canaveral produce?

Cape Canaveral reported 6,960,999 MWh (6.96 TWh) of net generation in 2025, a 61.4% capacity factor on 1,295 MW of nameplate capacity. From January to July 2026 it reported 4.50 TWh, which is provisional.

Where is Cape Canaveral?

Cape Canaveral is in Brevard County, Florida, at 28.4698, −80.7644. It is in the Florida Power & Light Company balancing area (FPL).

Who operates Cape Canaveral?

EIA-860M for August 2026 lists Florida Power & Light Co as the operator (EIA operator ID 6452). The operator is not always the owner.

When did Cape Canaveral start operating?

Its first generator began operating in April 2013, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page