WindOperatingWACM

Twin Buttes II Wind

Wind power plant in Prowers County, Colorado. 75 MW of nameplate capacity across 1 generator, operated by Avangrid Power LLC.

Also known as Twin Buttes II · EIA plant 61040

Analyst: free account, 1 question a day.

Colorado Green Holdings LLCLamar PlantVilas Solar ArrayTwin Buttes II Wind25 km
Open in the map
4 plants within 44 km, from EIA coordinates.

Key facts

Capacity
75 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2017First generator online
Operator
Avangrid Power LLCEIA operator ID 15399
Grid
WACMBalancing authority WACM
Price nodes
None linkedNo verified ISO node
Location
Prowers County, CO37.7730, −102.5460
EIA plant ID
61040EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Twin Buttes II Wind produces

Free · EIA-923

Net generation, 2025

298 GWh

297,973 MWh, final

Capacity factor, 2025

45.4%

2024: 44.9%

January to July 2026

174 GWh

Provisional

Range, 2018 to 2025

283.8–338.7

GWh a year. Low 2023, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
201712,321Not reported1 of 12
2018290,92244.3%12 of 12
2019309,70447.1%12 of 12
2020338,71751.4%12 of 12
2021309,52847.1%12 of 12
2022295,17244.9%12 of 12
2023283,75543.2%12 of 12
2024295,67244.9%12 of 12
2025297,97345.4%12 of 12
2026 (provisional, partial year)173,50745.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
WT1Onshore Wind Turbine75.0December 2017

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avangrid Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Twin Buttes II Wind and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Twin Buttes II Wind

More plants operated by Avangrid Power LLC

Questions about Twin Buttes II Wind

How much power does Twin Buttes II Wind produce?

Twin Buttes II Wind reported 297,973 MWh (298 GWh) of net generation in 2025, a 45.4% capacity factor on 75 MW of nameplate capacity. From January to July 2026 it reported 174 GWh, which is provisional.

Where is Twin Buttes II Wind?

Twin Buttes II Wind is in Prowers County, Colorado, at 37.7730, −102.5460. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).

Who operates Twin Buttes II Wind?

EIA-860M for August 2026 lists Avangrid Power LLC as the operator (EIA operator ID 15399). The operator is not always the owner.

When did Twin Buttes II Wind start operating?

Its first generator began operating in December 2017, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page