Puller Solar
Solar power plant in Middlesex County, Virginia. 15 MW of nameplate capacity across 1 generator, operated by Dominion Energy Inc..
Also known as UVA Puller Solar · EIA plant 62140
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 15 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- October 2018First generator online
- Operator
- Dominion Energy Inc.EIA operator ID 5248
- Grid
- PJMBalancing authority PJM
- Price nodes
- 1 PJM nodeResource nodes with prices
- Location
- Middlesex County, VA37.5725, −76.4673
- EIA plant ID
- 62140EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Puller Solar produces
Free · EIA-923Net generation, 2025
26.8 GWh
26,828 MWh, final
Capacity factor, 2025
20.4%
2024: 19.8%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2019 to 2025
26.1–29.6
GWh a year. Low 2024, high 2021
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | 3,381 | Not reported | 3 of 12 |
| 2019 | 28,962 | 22.0% | 12 of 12 |
| 2020 | 28,668 | 21.8% | 12 of 12 |
| 2021 | 29,558 | 22.5% | 12 of 12 |
| 2022 | 26,866 | 20.4% | 12 of 12 |
| 2023 | 27,709 | 21.1% | 12 of 12 |
| 2024 | 26,112 | 19.8% | 12 of 12 |
| 2025 | 26,828 | 20.4% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · PJMEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| PULL | Solar Photovoltaic | 15.0 | October 2018 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Dominion Energy Inc. as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Puller Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Puller Solar
More plants operated by Dominion Energy Inc.
Questions about Puller Solar
How much power does Puller Solar produce?
Puller Solar reported 26,828 MWh (26.8 GWh) of net generation in 2025, a 20.4% capacity factor on 15 MW of nameplate capacity.
Where is Puller Solar?
Puller Solar is in Middlesex County, Virginia, at 37.5725, −76.4673. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Puller Solar?
EIA-860M for August 2026 lists Dominion Energy Inc. as the operator (EIA operator ID 5248). The operator is not always the owner.
When did Puller Solar start operating?
Its first generator began operating in October 2018, according to EIA-860M.
Does InfraMap have power prices for Puller Solar?
Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Puller Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page