SolarBattery storageOperatingERCOT

Roadrunner, LLC Hybrid

Solar project in Upton County, Texas. 463.3 MW of nameplate capacity across 3 generators, operated by Roadrunner Solar, LLC.

Also known as Roadrunner, LLC · EIA plant 62561

This project groups Roadrunner, LLC Hybrid (EIA 62561). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

King Mountain Wind Ra…Castle Gap Solar HybridUpton County SolarCrossett Power Management LLCRoadrunner, LLC Hybrid5 km
Open in the map
6 plants within 12 km, from EIA coordinates.

Key facts

Capacity
463.3 MWSolar 400.0 · Battery storage 63.3
Generators
3 operatingEIA-860M, August 2026
Operating since
November 2019First generator online
Operator
Roadrunner Solar, LLCEIA operator ID 62047
Grid
ERCOTBalancing authority ERCO
Price nodes
2 ERCOT nodesResource nodes with prices
Location
Upton County, TX31.2194, −102.1922
EIA plant ID
62561EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Roadrunner, LLC Hybrid produces

Free · EIA-923

Net generation, 2025

1.08 TWh

1,080,313 MWh, final

Capacity factor, 2025

30.8%

2024: Not reported

January to July 2026

605 GWh

Provisional

Range, 2020 to 2025

0.9–1.1

TWh a year. Low 2020, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020854,14322.1%12 of 12
2021984,68528.1%12 of 12
20221,010,92628.9%12 of 12
2023534,170Not reported6 of 12
20241,007,544Not reported12 of 12
20251,080,31330.8%12 of 12
2026 (provisional, partial year)604,51029.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ERCOT

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BABatteries63.3July 2023
RODR1Solar Photovoltaic200.0November 2019
RODR2Solar Photovoltaic200.0September 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Roadrunner Solar, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Roadrunner, LLC Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Roadrunner, LLC Hybrid

Questions about Roadrunner, LLC Hybrid

How much power does Roadrunner, LLC Hybrid produce?

Roadrunner, LLC Hybrid reported 1,080,313 MWh (1.08 TWh) of net generation in 2025, a 30.8% capacity factor on 463.3 MW of nameplate capacity. From January to July 2026 it reported 605 GWh, which is provisional.

Where is Roadrunner, LLC Hybrid?

Roadrunner, LLC Hybrid is in Upton County, Texas, at 31.2194, −102.1922. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).

Who operates Roadrunner, LLC Hybrid?

EIA-860M for August 2026 lists Roadrunner Solar, LLC as the operator (EIA operator ID 62047). The operator is not always the owner.

When did Roadrunner, LLC Hybrid start operating?

Its first generator began operating in November 2019, according to EIA-860M.

Does InfraMap have power prices for Roadrunner, LLC Hybrid?

Yes. InfraMap has ERCOT day-ahead and real-time prices at 2 price nodes linked to Roadrunner, LLC Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page