Roadrunner, LLC Hybrid
Solar project in Upton County, Texas. 463.3 MW of nameplate capacity across 3 generators, operated by Roadrunner Solar, LLC.
Also known as Roadrunner, LLC · EIA plant 62561
This project groups Roadrunner, LLC Hybrid (EIA 62561). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 463.3 MWSolar 400.0 · Battery storage 63.3
- Generators
- 3 operatingEIA-860M, August 2026
- Operating since
- November 2019First generator online
- Operator
- Roadrunner Solar, LLCEIA operator ID 62047
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 2 ERCOT nodesResource nodes with prices
- Location
- Upton County, TX31.2194, −102.1922
- EIA plant ID
- 62561EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Roadrunner, LLC Hybrid produces
Free · EIA-923Net generation, 2025
1.08 TWh
1,080,313 MWh, final
Capacity factor, 2025
30.8%
2024: Not reported
January to July 2026
605 GWh
Provisional
Range, 2020 to 2025
0.9–1.1
TWh a year. Low 2020, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | 854,143 | 22.1% | 12 of 12 |
| 2021 | 984,685 | 28.1% | 12 of 12 |
| 2022 | 1,010,926 | 28.9% | 12 of 12 |
| 2023 | 534,170 | Not reported | 6 of 12 |
| 2024 | 1,007,544 | Not reported | 12 of 12 |
| 2025 | 1,080,313 | 30.8% | 12 of 12 |
| 2026 (provisional, partial year) | 604,510 | 29.8% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| BA | Batteries | 63.3 | July 2023 |
| RODR1 | Solar Photovoltaic | 200.0 | November 2019 |
| RODR2 | Solar Photovoltaic | 200.0 | September 2020 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Roadrunner Solar, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Roadrunner, LLC Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Roadrunner, LLC Hybrid
Questions about Roadrunner, LLC Hybrid
How much power does Roadrunner, LLC Hybrid produce?
Roadrunner, LLC Hybrid reported 1,080,313 MWh (1.08 TWh) of net generation in 2025, a 30.8% capacity factor on 463.3 MW of nameplate capacity. From January to July 2026 it reported 605 GWh, which is provisional.
Where is Roadrunner, LLC Hybrid?
Roadrunner, LLC Hybrid is in Upton County, Texas, at 31.2194, −102.1922. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates Roadrunner, LLC Hybrid?
EIA-860M for August 2026 lists Roadrunner Solar, LLC as the operator (EIA operator ID 62047). The operator is not always the owner.
When did Roadrunner, LLC Hybrid start operating?
Its first generator began operating in November 2019, according to EIA-860M.
Does InfraMap have power prices for Roadrunner, LLC Hybrid?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 2 price nodes linked to Roadrunner, LLC Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page