CoalOperatingPJM

Mountaineer

Coal power plant in Mason County, West Virginia. 1,300 MW of nameplate capacity across 1 generator, operated by Appalachian Power Co.

Also known as Mountaineer Plant · EIA plant 6264

Analyst: free account, 1 question a day.

RacineBHER Ravenswood Solar 1Gavin Power, LLCKyger CreekBelleville DamMountaineer10 km
Open in the map
6 plants within 23 km, from EIA coordinates.

Key facts

Capacity
1,300 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 1980First generator online
Operator
Appalachian Power CoEIA operator ID 733
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Mason County, WV38.9794, −81.9344
EIA plant ID
6264EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Mountaineer produces

Free · EIA-923

Net generation, 2025

6.87 TWh

6,870,571 MWh, final

Capacity factor, 2025

60.3%

2024: 41.4%

January to July 2026

4.43 TWh

Provisional

Range, 2015 to 2025

4.7–8.3

TWh a year. Low 2024, high 2019

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20007,344,422Not reported12 of 12
20016,113,576Not reported12 of 12
20028,985,024Not reported12 of 12
20039,738,217Not reported12 of 12
20048,267,917Not reported12 of 12
200510,524,085Not reported12 of 12
20067,173,682Not reported12 of 12
20079,375,421Not reported12 of 12
20089,818,558Not reported12 of 12
20098,978,247Not reported12 of 12
20108,073,85870.9%12 of 12
20119,388,37482.4%12 of 12
20128,292,57472.6%12 of 12
20135,471,42548.0%12 of 12
20148,241,23172.4%12 of 12
20157,463,21965.5%12 of 12
20167,809,39968.4%12 of 12
20177,147,24262.8%12 of 12
20185,710,01750.1%12 of 12
20198,255,23072.5%12 of 12
2020946,61425.1%4 of 12
2021269,50914.2%2 of 12
20225,216,83345.8%12 of 12
20234,968,70243.6%12 of 12
20244,725,20041.4%12 of 12
20256,870,57160.3%12 of 12
2026 (provisional, partial year)4,431,52667.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

CO₂, 2025

7.23M

US short tons. 2024: 5.06M

SO₂, 2025

3,401

US short tons

NOx, 2025

6,579

US short tons

CO₂ per MWh, calculated

1.05 t

About 2,106 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (1), matched to EIA plant 6264 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

1,177

million gallons

Consumption, 2024

1,037

million gallons

Source

Ohio River

Surface, Fresh. Natural-draft tower

Watershed stress

Very low/none · 0.132

USGS SUI, HUC12 Broad Run-Ohio River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal1,300.0September 1980

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Appalachian Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Mountaineer and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Mountaineer

More plants operated by Appalachian Power Co

Questions about Mountaineer

How much power does Mountaineer produce?

Mountaineer reported 6,870,571 MWh (6.87 TWh) of net generation in 2025, a 60.3% capacity factor on 1,300 MW of nameplate capacity. From January to July 2026 it reported 4.43 TWh, which is provisional.

Where is Mountaineer?

Mountaineer is in Mason County, West Virginia, at 38.9794, −81.9344. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Mountaineer?

EIA-860M for August 2026 lists Appalachian Power Co as the operator (EIA operator ID 733). The operator is not always the owner.

When did Mountaineer start operating?

Its first generator began operating in September 1980, according to EIA-860M.

Does InfraMap have power prices for Mountaineer?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Mountaineer, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page