SolarBattery storageOperatingISO-NE

CED Northampton Solar LLC Hybrid

Solar and battery storage project in Hampshire County, Massachusetts. 6.6 MW of nameplate capacity across 2 generators, operated by RWE Clean Energy.

Also known as CED Northampton Solar, LLC Hybrid · EIA plant 62695

This project groups CED Northampton Solar LLC Hybrid (EIA 62695). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Hatfield Renewables Community SolarNorthampton Landfill Solar PVSyncarpha Northampton Hybrid CSGEasthampton Landfill-…Beacon Solar, LLCWesthamptonCED Northampton Solar…2 km
Open in the map
6 plants within 4.0 km, from EIA coordinates.

Key facts

Capacity
6.6 MWSolar 4.3 · Battery storage 2.3
Generators
2 operatingEIA-860M, August 2026
Operating since
December 2019First generator online
Operator
RWE Clean EnergyEIA operator ID 67192
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
Hampshire County, MA42.3057, −72.7106
EIA plant ID
62695EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power CED Northampton Solar LLC Hybrid produces

Free · EIA-923

Net generation, 2025

6.46 GWh

6,459 MWh, final

Capacity factor, 2025

17.3%

2024: 18.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2021 to 2025

6.5–7.2

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
20190Not reported1 of 12
2020203Not reported1 of 12
20216,57717.5%12 of 12
20227,19819.1%12 of 12
20236,46217.4%12 of 12
20246,80618.2%12 of 12
20256,45917.3%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
NSESBatteries2.3December 2020
NSMASolar Photovoltaic4.3December 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RWE Clean Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query CED Northampton Solar LLC Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near CED Northampton Solar LLC Hybrid

More plants operated by RWE Clean Energy

Questions about CED Northampton Solar LLC Hybrid

How much power does CED Northampton Solar LLC Hybrid produce?

CED Northampton Solar LLC Hybrid reported 6,459 MWh (6.46 GWh) of net generation in 2025, a 17.3% capacity factor on 6.6 MW of nameplate capacity.

Where is CED Northampton Solar LLC Hybrid?

CED Northampton Solar LLC Hybrid is in Hampshire County, Massachusetts, at 42.3057, −72.7106. It is in the ISO New England Inc. balancing area (ISNE).

Who operates CED Northampton Solar LLC Hybrid?

EIA-860M for August 2026 lists RWE Clean Energy as the operator (EIA operator ID 67192). The operator is not always the owner.

Is CED Northampton Solar LLC Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 4.3 MW and battery storage capacity totals 2.3 MW.

When did CED Northampton Solar LLC Hybrid start operating?

Its first generator began operating in December 2019, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page