SolarOperatingPJM

Shelby Solar Array

Solar power plant in Richland County, Ohio. 1.9 MW of nameplate capacity across 1 generator, operated by Onsite Partners, LLC.

Also known as EIA plant 63390

Analyst: free account, 1 question a day.

Broshco Fabricated ProductsSycamore Creek Solar, LLCGalionShelby Solar Array10 km
Open in the map
6 plants within 21 km, from EIA coordinates.

Key facts

Capacity
1.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2019First generator online
Operator
Onsite Partners, LLCEIA operator ID 60571
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Richland County, OH40.8960, −82.6724
EIA plant ID
63390EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Shelby Solar Array produces

Free · EIA-923

Net generation, 2025

3.21 GWh

3,214 MWh, final

Capacity factor, 2025

19.3%

2024: 11.3%

January to July 2026

1.75 GWh

Provisional

Range, 2020 to 2025

1.9–3.7

GWh a year. Low 2024, high 2023

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
20190Not reported1 of 12
20203,47720.8%12 of 12
20213,41720.5%12 of 12
20223,58621.5%12 of 12
20233,66522.0%12 of 12
20241,88311.3%12 of 12
20253,21419.3%12 of 12
2026 (provisional, partial year)1,74618.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
SHBOHSolar Photovoltaic1.9December 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Onsite Partners, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Shelby Solar Array and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Shelby Solar Array

More plants operated by Onsite Partners, LLC

Questions about Shelby Solar Array

How much power does Shelby Solar Array produce?

Shelby Solar Array reported 3,214 MWh (3.21 GWh) of net generation in 2025, a 19.3% capacity factor on 1.9 MW of nameplate capacity. From January to July 2026 it reported 1.75 GWh, which is provisional.

Where is Shelby Solar Array?

Shelby Solar Array is in Richland County, Ohio, at 40.8960, −82.6724. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Shelby Solar Array?

EIA-860M for August 2026 lists Onsite Partners, LLC as the operator (EIA operator ID 60571). The operator is not always the owner.

When did Shelby Solar Array start operating?

Its first generator began operating in December 2019, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page