Natural gasOperatingPJM

Broshco Fabricated Products

Natural gas power plant in Richland County, Ohio. 4.7 MW of nameplate capacity across 4 generators, operated by Broshco Fabricated Products.

Also known as EIA plant 59373

Analyst: free account, 1 question a day.

Shelby NorthShelby Solar ArrayGalionBroshco Fabricated Products10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
4.7 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
September 2001First generator online
Operator
Broshco Fabricated ProductsEIA operator ID 59147
Grid
PJMBalancing authority PJM
Price nodes
None linkedNo verified ISO node
Location
Richland County, OH40.7761, −82.5686
EIA plant ID
59373EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Broshco Fabricated Products produces

Free · EIA-923

Net generation, 2025

193 MWh

193 MWh, final

Capacity factor, 2025

0.5%

2024: 6.1%

January to July 2026

46 MWh

Provisional

Range, 2015 to 2025

0.2–6.6

GWh a year. Low 2025, high 2018

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
20131,3263.2%12 of 12
20141,605Not reported12 of 12
20152,1875.3%12 of 12
20164,60211.1%12 of 12
20173,9999.7%12 of 12
20186,56415.9%12 of 12
20192,9657.2%12 of 12
20202,4726.0%12 of 12
20211,9634.8%12 of 12
20222,4586.0%12 of 12
20232,8456.9%12 of 12
20242,5056.1%12 of 12
20251930.5%12 of 12
2026 (provisional, partial year)460.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine1.2September 2001
2Natural Gas Fired Combustion Turbine1.2September 2001
3Natural Gas Fired Combustion Turbine1.2September 2001
4Natural Gas Fired Combustion Turbine1.1July 2005

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Broshco Fabricated Products as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Broshco Fabricated Products and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Broshco Fabricated Products

Questions about Broshco Fabricated Products

How much power does Broshco Fabricated Products produce?

Broshco Fabricated Products reported 193 MWh (193 MWh) of net generation in 2025, a 0.5% capacity factor on 4.7 MW of nameplate capacity. From January to July 2026 it reported 46 MWh, which is provisional.

Where is Broshco Fabricated Products?

Broshco Fabricated Products is in Richland County, Ohio, at 40.7761, −82.5686. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Broshco Fabricated Products?

EIA-860M for August 2026 lists Broshco Fabricated Products as the operator (EIA operator ID 59147). The operator is not always the owner.

When did Broshco Fabricated Products start operating?

Its first generator began operating in September 2001, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page