SolarBattery storageOperatingISO-NE

Hurteau Solar Project Hybrid

Solar and battery storage project in Worcester County, Massachusetts. 3.3 MW of nameplate capacity across 2 generators, operated by AES Distributed Energy.

Also known as EIA plant 63468

This project groups Hurteau Solar Project Hybrid (EIA 63468). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Palombo B Solar, LLC CSGPalombo Solar, LLC CSGBJ's Wholesale Club, Inc- UxbridgeTown of Uxbridge MA at Commerce DrMilk Street Solar, LLCBlackstone/TupperwareHurteau Solar Project Hybrid2 km
Open in the map
6 plants within 4.1 km, from EIA coordinates.

Key facts

Capacity
3.3 MWSolar 2.0 · Battery storage 1.3
Generators
2 operatingEIA-860M, August 2026
Operating since
March 2020First generator online
Operator
AES Distributed EnergyEIA operator ID 61012
Grid
ISO-NEBalancing authority ISNE
Price nodes
None linkedNo verified ISO node
Location
Worcester County, MA42.0248, −71.5925
EIA plant ID
63468EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Hurteau Solar Project Hybrid produces

Free · EIA-923

Net generation, 2025

2.78 GWh

2,776 MWh, final

Capacity factor, 2025

17.0%

2024: 18.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2021 to 2025

2.8–3.2

GWh a year. Low 2025, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
20202,123Not reported10 of 12
20213,15418.4%12 of 12
20223,16618.2%12 of 12
20233,10818.1%12 of 12
20243,02618.4%12 of 12
20252,77617.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BATTBatteries1.3March 2020
HURTUSolar Photovoltaic2.0March 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists AES Distributed Energy as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Hurteau Solar Project Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Hurteau Solar Project Hybrid

More plants operated by AES Distributed Energy

Questions about Hurteau Solar Project Hybrid

How much power does Hurteau Solar Project Hybrid produce?

Hurteau Solar Project Hybrid reported 2,776 MWh (2.78 GWh) of net generation in 2025, a 17.0% capacity factor on 3.3 MW of nameplate capacity.

Where is Hurteau Solar Project Hybrid?

Hurteau Solar Project Hybrid is in Worcester County, Massachusetts, at 42.0248, −71.5925. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Hurteau Solar Project Hybrid?

EIA-860M for August 2026 lists AES Distributed Energy as the operator (EIA operator ID 61012). The operator is not always the owner.

Is Hurteau Solar Project Hybrid a solar or a battery storage plant?

Both. Solar capacity totals 2 MW and battery storage capacity totals 1.3 MW.

When did Hurteau Solar Project Hybrid start operating?

Its first generator began operating in March 2020, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page