SolarOperatingCAISO

Camino Solar Hybrid

Solar power plant in Kern County, California. 44 MW of nameplate capacity across 1 generator, operated by Avangrid Power LLC.

Also known as EIA plant 63508

Analyst: free account, 1 question a day.

Manzana Wind LLCPacific Wind LLCValentine Solar, LLCNorth Rosamond Solar LLCRE AstoriaCamino Solar Hybrid5 km
Open in the map
6 plants within 9.7 km, from EIA coordinates.

Key facts

Capacity
44 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 2025First generator online
Operator
Avangrid Power LLCEIA operator ID 15399
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Kern County, CA34.9303, −118.4432
EIA plant ID
63508EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Camino Solar Hybrid produces

Free · EIA-923

Net generation, 2025

105 GWh

104,804 MWh, final. 9 of 12 months reported

Capacity factor, 2025

Not reported

2024: Not reported

January to July 2026

84.5 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024Not reportedNot reported0 of 12
2025104,804Not reported9 of 12
2026 (provisional, partial year)84,54437.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CSPV1Solar Photovoltaic44.0April 2025

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Avangrid Power LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Camino Solar Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Camino Solar Hybrid

More plants operated by Avangrid Power LLC

Questions about Camino Solar Hybrid

How much power does Camino Solar Hybrid produce?

Camino Solar Hybrid reported 104,804 MWh (105 GWh) of net generation in 2025. From January to July 2026 it reported 84.5 GWh, which is provisional. 9 of 12 months were reported for 2025.

Where is Camino Solar Hybrid?

Camino Solar Hybrid is in Kern County, California, at 34.9303, −118.4432. It is in the California Independent System Operator balancing area (CISO).

Who operates Camino Solar Hybrid?

EIA-860M for August 2026 lists Avangrid Power LLC as the operator (EIA operator ID 15399). The operator is not always the owner.

When did Camino Solar Hybrid start operating?

Its first generator began operating in April 2025, according to EIA-860M.

Does InfraMap have power prices for Camino Solar Hybrid?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Camino Solar Hybrid, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page