SolarOperatingCAISO

Chevron - Lost Hills Hybrid

Solar power plant in Kern County, California. 30 MW of nameplate capacity across 1 generator, operated by MN8 Energy LLC.

Also known as Chevron-Lost Hills Hybrid · EIA plant 63545

Analyst: free account, 1 question a day.

Nickel 1 Solar FacilityLost Hills Cogeneration PlantFlying GooseWildwood Solar I, LLCWonderful Huller & ShellingCottonwood Solar, LLC (Goose Lake)Chevron - Lost Hills…5 km
Open in the map
6 plants within 10 km, from EIA coordinates.

Key facts

Capacity
30 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
April 2020First generator online
Operator
MN8 Energy LLCEIA operator ID 61944
Grid
CAISOBalancing authority CISO
Price nodes
None linkedNo verified ISO node
Location
Kern County, CA35.6200, −119.6900
EIA plant ID
63545EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Chevron - Lost Hills Hybrid produces

Free · EIA-923

Net generation, 2025

65.8 GWh

65,771 MWh, final

Capacity factor, 2025

25.0%

2024: 24.6%

January to July 2026

41.9 GWh

Provisional

Range, 2021 to 2025

64.9–75.0

GWh a year. Low 2024, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
202056,034Not reported9 of 12
202175,02428.5%12 of 12
202274,36728.3%12 of 12
202368,89626.2%12 of 12
202464,91324.6%12 of 12
202565,77125.0%12 of 12
2026 (provisional, partial year)41,87527.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Solar Photovoltaic30.0April 2020

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists MN8 Energy LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Chevron - Lost Hills Hybrid and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Chevron - Lost Hills Hybrid

More plants operated by MN8 Energy LLC

Questions about Chevron - Lost Hills Hybrid

How much power does Chevron - Lost Hills Hybrid produce?

Chevron - Lost Hills Hybrid reported 65,771 MWh (65.8 GWh) of net generation in 2025, a 25.0% capacity factor on 30 MW of nameplate capacity. From January to July 2026 it reported 41.9 GWh, which is provisional.

Where is Chevron - Lost Hills Hybrid?

Chevron - Lost Hills Hybrid is in Kern County, California, at 35.6200, −119.6900. It is in the California Independent System Operator balancing area (CISO).

Who operates Chevron - Lost Hills Hybrid?

EIA-860M for August 2026 lists MN8 Energy LLC as the operator (EIA operator ID 61944). The operator is not always the owner.

When did Chevron - Lost Hills Hybrid start operating?

Its first generator began operating in April 2020, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page