SolarOperatingFPC

Charlie Creek Solar Power Plant

Solar power plant in Hardee County, Florida. 74.9 MW of nameplate capacity across 1 generator, operated by Duke Energy Florida, LLC.

Also known as EIA plant 63982

Analyst: free account, 1 question a day.

Tiger BayHines Energy ComplexVandolah Power StationCharlie Creek Solar10 km
Open in the map
6 plants within 30 km, from EIA coordinates.

Key facts

Capacity
74.9 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2022First generator online
Operator
Duke Energy Florida, LLCEIA operator ID 6455
Grid
FPCBalancing authority FPC
Price nodes
None linkedNo verified ISO node
Location
Hardee County, FL27.6398, −81.6544
EIA plant ID
63982EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Charlie Creek Solar produces

Free · EIA-923

Net generation, 2025

178 GWh

178,325 MWh, final

Capacity factor, 2025

27.2%

2024: 22.7%

January to July 2026

108 GWh

Provisional

Range, 2023 to 2025

149.2–178.3

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
202255,036Not reported6 of 12
2023166,63925.4%12 of 12
2024149,22422.7%12 of 12
2025178,32527.2%12 of 12
2026 (provisional, partial year)108,46228.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PV1Solar Photovoltaic74.9August 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Florida, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Charlie Creek Solar Power Plant and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Charlie Creek Solar

More plants operated by Duke Energy Florida, LLC

Questions about Charlie Creek Solar

How much power does Charlie Creek Solar Power Plant produce?

Charlie Creek Solar Power Plant reported 178,325 MWh (178 GWh) of net generation in 2025, a 27.2% capacity factor on 74.9 MW of nameplate capacity. From January to July 2026 it reported 108 GWh, which is provisional.

Where is Charlie Creek Solar Power Plant?

Charlie Creek Solar Power Plant is in Hardee County, Florida, at 27.6398, −81.6544. It is in the Duke Energy Florida Inc balancing area (FPC).

Who operates Charlie Creek Solar Power Plant?

EIA-860M for August 2026 lists Duke Energy Florida, LLC as the operator (EIA operator ID 6455). The operator is not always the owner.

When did Charlie Creek Solar Power Plant start operating?

Its first generator began operating in August 2022, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page