Key facts

Capacity
27.9 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
November 1940First generator online
Operator
U S Bureau of ReclamationEIA operator ID 2518
Grid
WACMBalancing authority WACM
Price nodes
None linkedNo verified ISO node
Location
Sierra County, NM33.1534, −107.1920
EIA plant ID
6402EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Elephant Butte produces

Free · EIA-923

Net generation, 2025

16.6 GWh

16,624 MWh, final

Capacity factor, 2025

6.8%

2024: 23.2%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−31.6–56.9

GWh a year. Low 2023, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200090,884Not reported12 of 12
200196,822Not reported12 of 12
200277,855Not reported12 of 12
200329,552Not reported12 of 12
200427,631Not reported12 of 12
200545,957Not reported12 of 12
200633,859Not reported12 of 12
200756,003Not reported12 of 12
200862,979Not reported12 of 12
200954,948Not reported12 of 12
201067,47327.6%12 of 12
201133,30813.6%12 of 12
201228,73211.7%12 of 12
20139,3083.8%12 of 12
201412,7995.2%12 of 12
201537,64515.4%12 of 12
201643,49117.7%12 of 12
201744,86518.4%12 of 12
201839,52416.2%12 of 12
201947,70219.5%12 of 12
202053,69521.9%12 of 12
202114,5856.0%12 of 12
202218,3027.5%12 of 12
2023−31,601-12.9%12 of 12
202456,93123.2%12 of 12
202516,6246.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric9.3November 1940
2Conventional Hydroelectric9.3November 1940
3Conventional Hydroelectric9.3November 1940

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists U S Bureau of Reclamation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Elephant Butte and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Elephant Butte

More plants operated by U S Bureau of Reclamation

Questions about Elephant Butte

How much power does Elephant Butte produce?

Elephant Butte reported 16,624 MWh (16.6 GWh) of net generation in 2025, a 6.8% capacity factor on 27.9 MW of nameplate capacity.

Where is Elephant Butte?

Elephant Butte is in Sierra County, New Mexico, at 33.1534, −107.1920. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).

Who operates Elephant Butte?

EIA-860M for August 2026 lists U S Bureau of Reclamation as the operator (EIA operator ID 2518). The operator is not always the owner.

When did Elephant Butte start operating?

Its first generator began operating in November 1940, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page