Prosperity Solar Farm CSG
Solar power plant in Jasper County, Missouri. 2.3 MW of nameplate capacity across 1 generator, operated by Empire District Electric Co.
Also known as Prosperity Solar Farm (CSG) · EIA plant 64225
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 2.3 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- March 2021First generator online
- Operator
- Empire District Electric CoEIA operator ID 5860
- Grid
- SPPBalancing authority SWPP
- Price nodes
- None linkedNo verified ISO node
- Location
- Jasper County, MO37.1271, −94.4337
- EIA plant ID
- 64225EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Prosperity Solar Farm CSG produces
Free · EIA-923Net generation, 2025
3.72 GWh
3,723 MWh, final
Capacity factor, 2025
18.5%
2024: 19.4%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2022 to 2025
3.2–4.0
GWh a year. Low 2022, high 2023
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | 1,253 | Not reported | 10 of 12 |
| 2022 | 3,200 | 15.9% | 12 of 12 |
| 2023 | 3,955 | 19.6% | 12 of 12 |
| 2024 | 3,925 | 19.4% | 12 of 12 |
| 2025 | 3,723 | 18.5% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| PROS1 | Solar Photovoltaic | 2.3 | March 2021 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Empire District Electric Co as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Prosperity Solar Farm CSG and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Prosperity Solar Farm CSG
More plants operated by Empire District Electric Co
Questions about Prosperity Solar Farm CSG
How much power does Prosperity Solar Farm CSG produce?
Prosperity Solar Farm CSG reported 3,723 MWh (3.72 GWh) of net generation in 2025, a 18.5% capacity factor on 2.3 MW of nameplate capacity.
Where is Prosperity Solar Farm CSG?
Prosperity Solar Farm CSG is in Jasper County, Missouri, at 37.1271, −94.4337. It is in the Southwest Power Pool balancing area (SWPP).
Who operates Prosperity Solar Farm CSG?
EIA-860M for August 2026 lists Empire District Electric Co as the operator (EIA operator ID 5860). The operator is not always the owner.
When did Prosperity Solar Farm CSG start operating?
Its first generator began operating in March 2021, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Project names from the USGS U.S. Large-Scale Solar Photovoltaic Database