Key facts

Capacity
690.5 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
May 1995First generator online
Operator
Empire District Electric CoEIA operator ID 5860
Grid
SPPBalancing authority SWPP
Price nodes
2 SPP nodesResource nodes with prices
Location
Jasper County, MO37.0659, −94.6140
EIA plant ID
7296EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power State Line Combined Cycle produces

Free · EIA-923

Net generation, 2025

2.45 TWh

2,453,082 MWh, final

Capacity factor, 2025

40.6%

2024: 38.1%

January to July 2026

1.28 TWh

Provisional

Range, 2016 to 2025

1.9–2.7

TWh a year. Low 2021, high 2019

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000323,595Not reported12 of 12
2001653,953Not reported12 of 12
20021,359,024Not reported12 of 12
2003936,412Not reported12 of 12
20041,164,805Not reported12 of 12
20051,909,169Not reported12 of 12
20061,507,155Not reported12 of 12
20071,979,321Not reported12 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
20101,831,68030.3%12 of 12
20111,926,93731.9%12 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
20162,308,60238.1%12 of 12
20172,450,77440.5%12 of 12
2018Not reportedNot reported0 of 12
20192,738,54545.3%12 of 12
2020943,37137.5%5 of 12
20211,946,512Not reported12 of 12
2022221,81343.2%1 of 12
20232,305,68738.1%12 of 12
20242,311,05338.1%12 of 12
20252,453,08240.6%12 of 12
2026 (provisional, partial year)1,280,88836.5%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

CO₂, 2025

1.04M

US short tons. 2024: 983,103

SO₂, 2025

5

US short tons

NOx, 2025

127

US short tons

CO₂ per MWh, calculated

0.42 t

About 849 lb per MWh

3 of 3 EPA units reported CO₂ in 2025 (1, 2-1, 2-2), matched to EIA plant 7296 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

661

million gallons

Consumption, 2024

587

million gallons

Source

Municipal, Wells

Ground, Fresh. Induced-draft tower

Watershed stress

Low · 0.261

USGS SUI, HUC12 Short Creek-Spring River

12 of 12 cooling months report withdrawal. Groundwater user; SUI describes surface water and is context only. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine123.0May 1995
2-1Natural Gas Fired Combined Cycle181.0June 2001
2-2Natural Gas Fired Combined Cycle180.0June 1997
2-3Natural Gas Fired Combined Cycle206.5June 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Empire District Electric Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query State Line Combined Cycle and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near State Line Combined Cycle

More plants operated by Empire District Electric Co

Questions about State Line Combined Cycle

How much power does State Line Combined Cycle produce?

State Line Combined Cycle reported 2,453,082 MWh (2.45 TWh) of net generation in 2025, a 40.6% capacity factor on 690.5 MW of nameplate capacity. From January to July 2026 it reported 1.28 TWh, which is provisional.

Where is State Line Combined Cycle?

State Line Combined Cycle is in Jasper County, Missouri, at 37.0659, −94.6140. It is in the Southwest Power Pool balancing area (SWPP).

Who operates State Line Combined Cycle?

EIA-860M for August 2026 lists Empire District Electric Co as the operator (EIA operator ID 5860). The operator is not always the owner.

When did State Line Combined Cycle start operating?

Its first generator began operating in May 1995, according to EIA-860M.

Does InfraMap have power prices for State Line Combined Cycle?

Yes. InfraMap has SPP day-ahead and real-time prices at 2 price nodes linked to State Line Combined Cycle, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)