El Algodon Alto Wind Farm, LLC
Wind power plant in San Patricio County, Texas. 200.2 MW of nameplate capacity across 1 generator, operated by RWE Clean Energy.
Also known as El Algodon Alto Wind Farm · EIA plant 64591
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 200.2 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- May 2022First generator online
- Operator
- RWE Clean EnergyEIA operator ID 67192
- Grid
- ERCOTBalancing authority ERCO
- Price nodes
- 1 ERCOT nodeResource nodes with prices
- Location
- San Patricio County, TX27.9927, −97.7440
- EIA plant ID
- 64591EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power El Algodon Alto Wind Farm produces
Free · EIA-923Net generation, 2025
651 GWh
650,517 MWh, final
Capacity factor, 2025
37.1%
2024: 35.4%
January to July 2026
388 GWh
Provisional
Range, 2023 to 2025
623.3–650.5
GWh a year. Low 2024, high 2025
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | Not reported | Not reported | 0 of 12 |
| 2012 | Not reported | Not reported | 0 of 12 |
| 2013 | Not reported | Not reported | 0 of 12 |
| 2014 | Not reported | Not reported | 0 of 12 |
| 2015 | Not reported | Not reported | 0 of 12 |
| 2016 | Not reported | Not reported | 0 of 12 |
| 2017 | Not reported | Not reported | 0 of 12 |
| 2018 | Not reported | Not reported | 0 of 12 |
| 2019 | Not reported | Not reported | 0 of 12 |
| 2020 | Not reported | Not reported | 0 of 12 |
| 2021 | Not reported | Not reported | 0 of 12 |
| 2022 | 404,407 | Not reported | 8 of 12 |
| 2023 | 634,782 | 36.2% | 12 of 12 |
| 2024 | 623,318 | 35.4% | 12 of 12 |
| 2025 | 650,517 | 37.1% | 12 of 12 |
| 2026 (provisional, partial year) | 388,267 | 38.1% | 7 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free account · ERCOTEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| EEA | Onshore Wind Turbine | 200.2 | May 2022 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RWE Clean Energy as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query El Algodon Alto Wind Farm, LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near El Algodon Alto Wind Farm
More plants operated by RWE Clean Energy
Questions about El Algodon Alto Wind Farm
How much power does El Algodon Alto Wind Farm, LLC produce?
El Algodon Alto Wind Farm, LLC reported 650,517 MWh (651 GWh) of net generation in 2025, a 37.1% capacity factor on 200.2 MW of nameplate capacity. From January to July 2026 it reported 388 GWh, which is provisional.
Where is El Algodon Alto Wind Farm, LLC?
El Algodon Alto Wind Farm, LLC is in San Patricio County, Texas, at 27.9927, −97.7440. It is in the Electric Reliability Council of Texas, Inc. balancing area (ERCO).
Who operates El Algodon Alto Wind Farm, LLC?
EIA-860M for August 2026 lists RWE Clean Energy as the operator (EIA operator ID 67192). The operator is not always the owner.
When did El Algodon Alto Wind Farm, LLC start operating?
Its first generator began operating in May 2022, according to EIA-860M.
Does InfraMap have power prices for El Algodon Alto Wind Farm, LLC?
Yes. InfraMap has ERCOT day-ahead and real-time prices at 1 price node linked to El Algodon Alto Wind Farm, LLC, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- ERCOT day-ahead and real-time prices; node and hub assignments as of 2026-10-05
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page