SolarBattery storageOperatingCAISO

Edwards Sanborn E3

Solar and battery storage project in Kern County, California. 38.1 MW of nameplate capacity across 2 generators, operated by Terra-Gen Operating Co-Hybrid.

Also known as EIA plant 64877

This project groups Edwards Sanborn E3 (EIA 64877). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Edwards Sanborn E2Edwards Sanborn E1ASanborn BESS 4Edwards Sanborn E32 km
Open in the map
5 plants within 3.5 km, from EIA coordinates.

Key facts

Capacity
38.1 MWSolar 27.1 · Battery storage 11.0
Generators
2 operatingEIA-860M, August 2026
Operating since
December 2021First generator online
Operator
Terra-Gen Operating Co-HybridEIA operator ID 64366
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
Kern County, CA34.9463, −118.1265
EIA plant ID
64877EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Edwards Sanborn E3 produces

Free · EIA-923

Net generation, 2025

56.1 GWh

56,078 MWh, final

Capacity factor, 2025

24.2%

2024: 21.9%

January to July 2026

36.6 GWh

Provisional

Range, 2022 to 2025

50.4–59.2

GWh a year. Low 2024, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
20211,172Not reported1 of 12
202259,207Not reported12 of 12
202351,82722.6%12 of 12
202450,44421.9%12 of 12
202556,07824.2%12 of 12
2026 (provisional, partial year)36,58128.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
BESSBatteries11.0December 2021
PVSolar Photovoltaic27.1December 2021

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Terra-Gen Operating Co-Hybrid as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Edwards Sanborn E3 and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Edwards Sanborn E3

More plants operated by Terra-Gen Operating Co-Hybrid

Questions about Edwards Sanborn E3

How much power does Edwards Sanborn E3 produce?

Edwards Sanborn E3 reported 56,078 MWh (56.1 GWh) of net generation in 2025, a 24.2% capacity factor on 38.1 MW of nameplate capacity. From January to July 2026 it reported 36.6 GWh, which is provisional.

Where is Edwards Sanborn E3?

Edwards Sanborn E3 is in Kern County, California, at 34.9463, −118.1265. It is in the California Independent System Operator balancing area (CISO).

Who operates Edwards Sanborn E3?

EIA-860M for August 2026 lists Terra-Gen Operating Co-Hybrid as the operator (EIA operator ID 64366). The operator is not always the owner.

Is Edwards Sanborn E3 a solar or a battery storage plant?

Both. Solar capacity totals 27.1 MW and battery storage capacity totals 11 MW.

When did Edwards Sanborn E3 start operating?

Its first generator began operating in December 2021, according to EIA-860M.

Does InfraMap have power prices for Edwards Sanborn E3?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Edwards Sanborn E3, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page