SolarBattery storageOperatingNYISO

Svenski Solar (Hybrid)

Solar and battery storage project in Orange County, New York. 4 MW of nameplate capacity across 2 generators, operated by Generate Capital.

Also known as EIA plant 66232

This project groups Svenski Solar (Hybrid) (EIA 66232). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

CMR Solar LLCFogarty CSGDubois Solar (Hybrid)Maybrook Solar, LLC (CSG)RT 52 Walden Solar 1, LLC HybridWaldenSvenski Solar (Hybrid)5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
4 MWSolar 2.0 · Battery storage 2.0
Generators
2 operatingEIA-860M, August 2026
Operating since
April 2022First generator online
Operator
Generate CapitalEIA operator ID 61194
Grid
NYISOBalancing authority NYIS
Price nodes
None linkedNo verified ISO node
Location
Orange County, NY41.5350, −74.3229
EIA plant ID
66232EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Svenski Solar (Hybrid) produces

Free · EIA-923

Net generation, 2025

3.26 GWh

3,262 MWh, final

Capacity factor, 2025

18.6%

2024: 14.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2023 to 2025

1.8–3.3

GWh a year. Low 2023, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
20221,898Not reported9 of 12
20231,80210.5%12 of 12
20242,61114.9%12 of 12
20253,26218.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
10894Solar Photovoltaic2.0April 2022
BATBatteries2.0April 2022

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Generate Capital as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Svenski Solar (Hybrid) and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Svenski Solar (Hybrid)

More plants operated by Generate Capital

Questions about Svenski Solar (Hybrid)

How much power does Svenski Solar (Hybrid) produce?

Svenski Solar (Hybrid) reported 3,262 MWh (3.26 GWh) of net generation in 2025, a 18.6% capacity factor on 4 MW of nameplate capacity.

Where is Svenski Solar (Hybrid)?

Svenski Solar (Hybrid) is in Orange County, New York, at 41.5350, −74.3229. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Svenski Solar (Hybrid)?

EIA-860M for August 2026 lists Generate Capital as the operator (EIA operator ID 61194). The operator is not always the owner.

Is Svenski Solar (Hybrid) a solar or a battery storage plant?

Both. Solar capacity totals 2 MW and battery storage capacity totals 2 MW.

When did Svenski Solar (Hybrid) start operating?

Its first generator began operating in April 2022, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page