SolarOperatingPJM

Fox Squirrel Solar

Solar power plant in Madison County, Ohio. 577 MW of nameplate capacity across 1 generator, operated by EDF Renewable Asset Holdings, Inc..

Also known as EIA plant 67239

Analyst: free account, 1 question a day.

Big Plain Solar, LLCDarby Power, LLCIGS CMH4, LLCBuckeye SolarPickaway SolarTosoh SMDFox Squirrel Solar10 km
Open in the map
6 plants within 30 km, from EIA coordinates.

Key facts

Capacity
577 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2023First generator online
Operator
EDF Renewable Asset Holdings, Inc.EIA operator ID 57170
Grid
PJMBalancing authority PJM
Price nodes
1 PJM nodeResource nodes with prices
Location
Madison County, OH39.7775, −83.3671
EIA plant ID
67239EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fox Squirrel Solar produces

Free · EIA-923

Net generation, 2025

1.17 TWh

1,168,589 MWh, final

Capacity factor, 2025

23.1%

2024: 12.3%

January to July 2026

773 GWh

Provisional

Range, 2024 to 2025

0.6–1.2

TWh a year. Low 2024, high 2025

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
20237,995Not reported1 of 12
2024623,07512.3%12 of 12
20251,168,58923.1%12 of 12
2026 (provisional, partial year)772,78526.3%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · PJM

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
FOX01Solar Photovoltaic577.0December 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists EDF Renewable Asset Holdings, Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fox Squirrel Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fox Squirrel Solar

More plants operated by EDF Renewable Asset Holdings, Inc.

Questions about Fox Squirrel Solar

How much power does Fox Squirrel Solar produce?

Fox Squirrel Solar reported 1,168,589 MWh (1.17 TWh) of net generation in 2025, a 23.1% capacity factor on 577 MW of nameplate capacity. From January to July 2026 it reported 773 GWh, which is provisional.

Where is Fox Squirrel Solar?

Fox Squirrel Solar is in Madison County, Ohio, at 39.7775, −83.3671. It is in the PJM Interconnection, LLC balancing area (PJM).

Who operates Fox Squirrel Solar?

EIA-860M for August 2026 lists EDF Renewable Asset Holdings, Inc. as the operator (EIA operator ID 57170). The operator is not always the owner.

When did Fox Squirrel Solar start operating?

Its first generator began operating in December 2023, according to EIA-860M.

Does InfraMap have power prices for Fox Squirrel Solar?

Yes. InfraMap has PJM day-ahead and real-time prices at 1 price node linked to Fox Squirrel Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • PJM day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page