WindOperatingMISO

Fenton Wind Farm

Wind power plant in Murray County, Minnesota. 205.5 MW of nameplate capacity across 1 generator, operated by EDF Renewable Asset Holdings, Inc..

Also known as Fenton · EIA plant 56617

Analyst: free account, 1 question a day.

Valley View Transmission LLCEastridge Wind ProjectWindshare LLCNobles 2 Wind ProjectFenton Wind Farm5 km
Open in the map
6 plants within 15 km, from EIA coordinates.

Key facts

Capacity
205.5 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
September 2007First generator online
Operator
EDF Renewable Asset Holdings, Inc.EIA operator ID 57170
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Murray County, MN43.8528, −96.0183
EIA plant ID
56617EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Fenton Wind Farm produces

Free · EIA-923

Net generation, 2025

388 GWh

387,878 MWh, final

Capacity factor, 2025

21.5%

2024: 15.1%

January to July 2026

210 GWh

Provisional

Range, 2015 to 2025

272.0–737.6

GWh a year. Low 2024, high 2015

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
200784,847Not reported12 of 12
2008749,251Not reported12 of 12
2009643,940Not reported12 of 12
2010660,54636.7%12 of 12
2011739,06141.1%12 of 12
2012751,91841.7%12 of 12
2013667,33537.1%12 of 12
2014749,21041.6%12 of 12
2015737,59941.0%12 of 12
2016735,76540.8%12 of 12
2017692,82438.5%12 of 12
2018645,67035.9%12 of 12
2019563,52631.3%12 of 12
2020487,86327.0%12 of 12
2021308,67017.1%12 of 12
2022396,21322.0%12 of 12
2023312,29717.3%12 of 12
2024271,97515.1%12 of 12
2025387,87821.5%12 of 12
2026 (provisional, partial year)209,76120.1%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Onshore Wind Turbine205.5September 2007

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists EDF Renewable Asset Holdings, Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Fenton Wind Farm and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Fenton Wind Farm

More plants operated by EDF Renewable Asset Holdings, Inc.

Questions about Fenton Wind Farm

How much power does Fenton Wind Farm produce?

Fenton Wind Farm reported 387,878 MWh (388 GWh) of net generation in 2025, a 21.5% capacity factor on 205.5 MW of nameplate capacity. From January to July 2026 it reported 210 GWh, which is provisional.

Where is Fenton Wind Farm?

Fenton Wind Farm is in Murray County, Minnesota, at 43.8528, −96.0183. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Fenton Wind Farm?

EIA-860M for August 2026 lists EDF Renewable Asset Holdings, Inc. as the operator (EIA operator ID 57170). The operator is not always the owner.

When did Fenton Wind Farm start operating?

Its first generator began operating in September 2007, according to EIA-860M.

Does InfraMap have power prices for Fenton Wind Farm?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Fenton Wind Farm, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page