Glaciers Edge Wind Project

Wind power plant in Cherokee County, Iowa. 211.7 MW of nameplate capacity across 1 generator, operated by EDF Renewable Asset Holdings, Inc..

Also known as Glaciers Edge · EIA plant 62035

Analyst: free account, 1 question a day.

Plymouth WindHighland Wind Project (IA)Storm Lake IIStorm Lake 1O'Brien WindOtter Creek Ethanol Poet - Ashton25 km
Open in the map
6 plants within 46 km, from EIA coordinates.

Key facts

Capacity
211.7 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2019First generator online
Operator
EDF Renewable Asset Holdings, Inc.EIA operator ID 57170
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Cherokee County, IA42.8620, −95.7720
EIA plant ID
62035EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Glaciers Edge Wind Project produces

Free · EIA-923

Net generation, 2025

828 GWh

828,381 MWh, final

Capacity factor, 2025

44.7%

2024: 46.5%

January to July 2026

493 GWh

Provisional

Range, 2020 to 2025

796.2–984.1

GWh a year. Low 2020, high 2022

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
201957,238Not reported1 of 12
2020796,22242.8%12 of 12
2021867,35646.8%12 of 12
2022984,07553.1%12 of 12
2023812,88543.8%12 of 12
2024865,12746.5%12 of 12
2025828,38144.7%12 of 12
2026 (provisional, partial year)493,23145.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEWOnshore Wind Turbine211.7December 2019

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists EDF Renewable Asset Holdings, Inc. as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Glaciers Edge Wind Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Glaciers Edge Wind Project

More plants operated by EDF Renewable Asset Holdings, Inc.

Questions about Glaciers Edge Wind Project

How much power does Glaciers Edge Wind Project produce?

Glaciers Edge Wind Project reported 828,381 MWh (828 GWh) of net generation in 2025, a 44.7% capacity factor on 211.7 MW of nameplate capacity. From January to July 2026 it reported 493 GWh, which is provisional.

Where is Glaciers Edge Wind Project?

Glaciers Edge Wind Project is in Cherokee County, Iowa, at 42.8620, −95.7720. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Glaciers Edge Wind Project?

EIA-860M for August 2026 lists EDF Renewable Asset Holdings, Inc. as the operator (EIA operator ID 57170). The operator is not always the owner.

When did Glaciers Edge Wind Project start operating?

Its first generator began operating in December 2019, according to EIA-860M.

Does InfraMap have power prices for Glaciers Edge Wind Project?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Glaciers Edge Wind Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page