Kama 1 LLC
Solar and battery storage project in Mendocino County, California. 2 MW of nameplate capacity across 2 generators, operated by Standard Solar.
Also known as EIA plant 68526
This project groups Kama 1 LLC (EIA 68526). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 2 MWSolar 1.6 · Battery storage 0.4
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- May 2026First generator online
- Operator
- Standard SolarEIA operator ID 60531
- Grid
- CAISOBalancing authority CISO
- Price nodes
- None linkedNo verified ISO node
- Location
- Mendocino County, CA38.9911, −123.1027
- EIA plant ID
- 68526EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Kama 1 produces
Free · EIA-923EIA-923 has no net generation reported for this plant.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 11 | Solar Photovoltaic | 1.6 | May 2026 |
| 11B | Batteries | 0.4 | May 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Standard Solar as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Kama 1 LLC and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Kama 1
More plants operated by Standard Solar
Questions about Kama 1
Where is Kama 1 LLC?
Kama 1 LLC is in Mendocino County, California, at 38.9911, −123.1027. It is in the California Independent System Operator balancing area (CISO).
Who operates Kama 1 LLC?
EIA-860M for August 2026 lists Standard Solar as the operator (EIA operator ID 60531). The operator is not always the owner.
Is Kama 1 LLC a solar or a battery storage plant?
Both. Solar capacity totals 1.6 MW and battery storage capacity totals 0.4 MW.
When did Kama 1 LLC start operating?
Its first generator began operating in May 2026, according to EIA-860M.