Redemeyer Road Solar
Solar and battery storage project in Mendocino County, California. 8 MW of nameplate capacity across 2 generators, operated by RPCA Solar 10, LLC.
Also known as EIA plant 69136
This project groups Redemeyer Road Solar (EIA 69136). EIA reports them as separate plants.
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 8 MWSolar 4.0 · Battery storage 4.0
- Generators
- 2 operatingEIA-860M, August 2026
- Operating since
- June 2026First generator online
- Operator
- RPCA Solar 10, LLCEIA operator ID 67270
- Grid
- CAISOBalancing authority CISO
- Price nodes
- 2 CAISO nodesResource nodes with prices
- Location
- Mendocino County, CA39.1823, −123.1906
- EIA plant ID
- 69136EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Redemeyer Road Solar produces
Free · EIA-923EIA-923 has no net generation reported for this plant.
Power prices and basis
Free account · CAISOEmissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| REDBA | Batteries | 4.0 | June 2026 |
| REDPV | Solar Photovoltaic | 4.0 | June 2026 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RPCA Solar 10, LLC as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Redemeyer Road Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Redemeyer Road Solar
Questions about Redemeyer Road Solar
Where is Redemeyer Road Solar?
Redemeyer Road Solar is in Mendocino County, California, at 39.1823, −123.1906. It is in the California Independent System Operator balancing area (CISO).
Who operates Redemeyer Road Solar?
EIA-860M for August 2026 lists RPCA Solar 10, LLC as the operator (EIA operator ID 67270). The operator is not always the owner.
Is Redemeyer Road Solar a solar or a battery storage plant?
Both. Solar capacity totals 4 MW and battery storage capacity totals 4 MW.
When did Redemeyer Road Solar start operating?
Its first generator began operating in June 2026, according to EIA-860M.
Does InfraMap have power prices for Redemeyer Road Solar?
Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Redemeyer Road Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page