SolarBattery storageOperatingCAISO

Redemeyer Road Solar

Solar and battery storage project in Mendocino County, California. 8 MW of nameplate capacity across 2 generators, operated by RPCA Solar 10, LLC.

Also known as EIA plant 69136

This project groups Redemeyer Road Solar (EIA 69136). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Kama 1 LLCAidlin Geothermal Power PlantCloverdale Solar IASTIRedemeyer Road Solar25 km
Open in the map
6 plants within 50 km, from EIA coordinates.

Key facts

Capacity
8 MWSolar 4.0 · Battery storage 4.0
Generators
2 operatingEIA-860M, August 2026
Operating since
June 2026First generator online
Operator
RPCA Solar 10, LLCEIA operator ID 67270
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
Mendocino County, CA39.1823, −123.1906
EIA plant ID
69136EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Redemeyer Road Solar produces

Free · EIA-923

EIA-923 has no net generation reported for this plant.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
REDBABatteries4.0June 2026
REDPVSolar Photovoltaic4.0June 2026

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists RPCA Solar 10, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Redemeyer Road Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Redemeyer Road Solar

Questions about Redemeyer Road Solar

Where is Redemeyer Road Solar?

Redemeyer Road Solar is in Mendocino County, California, at 39.1823, −123.1906. It is in the California Independent System Operator balancing area (CISO).

Who operates Redemeyer Road Solar?

EIA-860M for August 2026 lists RPCA Solar 10, LLC as the operator (EIA operator ID 67270). The operator is not always the owner.

Is Redemeyer Road Solar a solar or a battery storage plant?

Both. Solar capacity totals 4 MW and battery storage capacity totals 4 MW.

When did Redemeyer Road Solar start operating?

Its first generator began operating in June 2026, according to EIA-860M.

Does InfraMap have power prices for Redemeyer Road Solar?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Redemeyer Road Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page