HydroOperatingWACM

Towaoc

Hydro power plant in Montezuma County, Colorado. 11.4 MW of nameplate capacity across 1 generator, operated by U S Bureau of Reclamation.

Also known as Towaoc Power Plant · EIA plant 7373

Analyst: free account, 1 question a day.

Cortez Solar 2, LLCCortez Solar 1, LLCCortez Solar 3, LLCMcPheeDolores Canyon SolarTowaoc20 km
Open in the map
5 plants within 34 km, from EIA coordinates.

Key facts

Capacity
11.4 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 1993First generator online
Operator
U S Bureau of ReclamationEIA operator ID 2518
Grid
WACMBalancing authority WACM
Price nodes
1 SPP nodeResource nodes with prices
Location
Montezuma County, CO37.4295, −108.5749
EIA plant ID
7373EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Towaoc produces

Free · EIA-923

Net generation, 2025

9.01 GWh

9,011 MWh, final

Capacity factor, 2025

9.0%

2024: 9.8%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

7.3–17.9

GWh a year. Low 2021, high 2017

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200023,357Not reported12 of 12
200121,645Not reported12 of 12
20024,695Not reported12 of 12
20036,260Not reported12 of 12
200416,271Not reported12 of 12
200516,877Not reported12 of 12
200612,565Not reported12 of 12
20073,179Not reported12 of 12
200819,217Not reported12 of 12
200914,675Not reported12 of 12
201014,93115.0%12 of 12
201116,45016.5%12 of 12
201216,24216.2%12 of 12
20138,7868.8%12 of 12
201418,00818.0%12 of 12
201517,45017.5%12 of 12
201617,86217.8%12 of 12
201717,87717.9%12 of 12
201811,19211.2%12 of 12
201917,08217.1%12 of 12
202017,56917.5%12 of 12
20217,3217.3%12 of 12
20227,5507.6%12 of 12
202315,78815.8%12 of 12
20249,8059.8%12 of 12
20259,0119.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · SPP

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Hydroelectric11.4May 1993

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists U S Bureau of Reclamation as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Towaoc and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Towaoc

More plants operated by U S Bureau of Reclamation

Questions about Towaoc

How much power does Towaoc produce?

Towaoc reported 9,011 MWh (9.01 GWh) of net generation in 2025, a 9.0% capacity factor on 11.4 MW of nameplate capacity.

Where is Towaoc?

Towaoc is in Montezuma County, Colorado, at 37.4295, −108.5749. It is in the Western Area Power Administration - Rocky Mountain Region balancing area (WACM).

Who operates Towaoc?

EIA-860M for August 2026 lists U S Bureau of Reclamation as the operator (EIA operator ID 2518). The operator is not always the owner.

When did Towaoc start operating?

Its first generator began operating in May 1993, according to EIA-860M.

Does InfraMap have power prices for Towaoc?

Yes. InfraMap has SPP day-ahead and real-time prices at 1 price node linked to Towaoc, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • SPP day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page