OilOperating

NSB Wainwright Utility

Oil power plant in North Slope, Alaska. 3 MW of nameplate capacity across 5 generators, operated by North Slope Borough Power & Light (AK).

Also known as EIA plant 7488

Analyst: free account, 1 question a day.

NSB Wainwright Utility500 m
Open in the map
No other mapped plant within 60 km.

Key facts

Capacity
3 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
August 1988First generator online
Operator
North Slope Borough Power & Light (AK)EIA operator ID 26616
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
North Slope, AK70.6429, −160.0205
EIA plant ID
7488EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power NSB Wainwright Utility produces

Free · EIA-923

Net generation, 2025

6.81 GWh

6,811 MWh, final

Capacity factor, 2025

25.9%

2024: 26.7%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

6.8–7.1

GWh a year. Low 2016, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20026,002Not reported12 of 12
20035,418Not reported12 of 12
20044,810Not reported12 of 12
20054,652Not reported12 of 12
20064,900Not reported12 of 12
20075,000Not reported12 of 12
20085,679Not reported12 of 12
20095,821Not reported12 of 12
20105,30120.2%12 of 12
20116,25823.8%12 of 12
20126,35424.1%12 of 12
20136,34224.1%12 of 12
20146,35724.2%12 of 12
20156,81225.9%12 of 12
20166,79625.8%12 of 12
20176,89126.2%12 of 12
20186,94726.4%12 of 12
20196,96226.5%12 of 12
20207,09926.9%12 of 12
20216,92226.3%12 of 12
20226,95426.5%12 of 12
20236,83926.0%12 of 12
20247,03526.7%12 of 12
20256,81125.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PG1Petroleum Liquids0.4August 1988
PG2Petroleum Liquids0.4August 1988
PG3Petroleum Liquids0.4August 1989
PG4APetroleum Liquids0.9October 2001
PG5Petroleum Liquids0.9October 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Slope Borough Power & Light (AK) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query NSB Wainwright Utility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near NSB Wainwright Utility

More plants operated by North Slope Borough Power & Light (AK)

Questions about NSB Wainwright Utility

How much power does NSB Wainwright Utility produce?

NSB Wainwright Utility reported 6,811 MWh (6.81 GWh) of net generation in 2025, a 25.9% capacity factor on 3 MW of nameplate capacity.

Where is NSB Wainwright Utility?

NSB Wainwright Utility is in North Slope, Alaska, at 70.6429, −160.0205.

Who operates NSB Wainwright Utility?

EIA-860M for August 2026 lists North Slope Borough Power & Light (AK) as the operator (EIA operator ID 26616). The operator is not always the owner.

When did NSB Wainwright Utility start operating?

Its first generator began operating in August 1988, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page