OilOperating

NSB Anaktuvuk Pass

Oil power plant in North Slope, Alaska. 2.7 MW of nameplate capacity across 5 generators, operated by North Slope Borough Power & Light (AK).

Also known as EIA plant 7487

Analyst: free account, 1 question a day.

NSB Anaktuvuk Pass500 m
Open in the map
No other mapped plant within 60 km.

Key facts

Capacity
2.7 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
September 1994First generator online
Operator
North Slope Borough Power & Light (AK)EIA operator ID 26616
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
North Slope, AK68.1380, −151.7410
EIA plant ID
7487EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power NSB Anaktuvuk Pass produces

Free · EIA-923

Net generation, 2025

4.14 GWh

4,135 MWh, final

Capacity factor, 2025

17.5%

2024: 17.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

3.7–4.1

GWh a year. Low 2023, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20024,111Not reported12 of 12
20033,922Not reported12 of 12
20043,847Not reported12 of 12
20053,716Not reported12 of 12
20063,600Not reported12 of 12
20074,000Not reported12 of 12
20083,185Not reported12 of 12
20093,778Not reported12 of 12
20103,25313.3%12 of 12
20113,59914.7%12 of 12
20124,04616.5%12 of 12
20134,00016.9%12 of 12
20143,96416.8%12 of 12
20153,81116.1%12 of 12
20163,85516.3%12 of 12
20173,90716.5%12 of 12
20183,80416.1%12 of 12
20193,81316.1%12 of 12
20203,88216.4%12 of 12
20213,92416.6%12 of 12
20223,85916.3%12 of 12
20233,74415.8%12 of 12
20244,11817.4%12 of 12
20254,13517.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids0.3September 1994
2Petroleum Liquids0.3September 1994
3Petroleum Liquids0.3September 1994
6Petroleum Liquids0.9December 2003
7Petroleum Liquids0.9December 2003

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Slope Borough Power & Light (AK) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query NSB Anaktuvuk Pass and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near NSB Anaktuvuk Pass

More plants operated by North Slope Borough Power & Light (AK)

Questions about NSB Anaktuvuk Pass

How much power does NSB Anaktuvuk Pass produce?

NSB Anaktuvuk Pass reported 4,135 MWh (4.14 GWh) of net generation in 2025, a 17.5% capacity factor on 2.7 MW of nameplate capacity.

Where is NSB Anaktuvuk Pass?

NSB Anaktuvuk Pass is in North Slope, Alaska, at 68.1380, −151.7410.

Who operates NSB Anaktuvuk Pass?

EIA-860M for August 2026 lists North Slope Borough Power & Light (AK) as the operator (EIA operator ID 26616). The operator is not always the owner.

When did NSB Anaktuvuk Pass start operating?

Its first generator began operating in September 1994, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page