OilOperating

NSB Point Hope Utility

Oil power plant in North Slope, Alaska. 3.1 MW of nameplate capacity across 4 generators, operated by North Slope Borough Power & Light (AK).

Also known as EIA plant 7485

Analyst: free account, 1 question a day.

NSB Point Hope Utility500 m
Open in the map
No other mapped plant within 60 km.

Key facts

Capacity
3.1 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
September 1995First generator online
Operator
North Slope Borough Power & Light (AK)EIA operator ID 26616
Grid
Not reported
Price nodes
None linkedNo verified ISO node
Location
North Slope, AK68.3484, −166.7372
EIA plant ID
7485EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power NSB Point Hope Utility produces

Free · EIA-923

Net generation, 2025

6.68 GWh

6,678 MWh, final

Capacity factor, 2025

24.6%

2024: 25.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

4.3–6.8

GWh a year. Low 2015, high 2024

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
20026,077Not reported12 of 12
20036,447Not reported12 of 12
20046,320Not reported12 of 12
20055,839Not reported12 of 12
20065,800Not reported12 of 12
20075,000Not reported12 of 12
20085,091Not reported12 of 12
20095,522Not reported12 of 12
20105,47623.2%12 of 12
20116,15326.0%12 of 12
20126,33726.7%12 of 12
20136,346Not reported12 of 12
20145,759Not reported12 of 12
20154,33216.0%12 of 12
20166,54924.1%12 of 12
20176,54024.1%12 of 12
20186,51224.0%12 of 12
20196,26923.1%12 of 12
20206,24422.9%12 of 12
20216,46823.8%12 of 12
20226,36923.5%12 of 12
20236,72524.8%12 of 12
20246,80725.0%12 of 12
20256,67824.6%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
PG1APetroleum Liquids1.0September 2014
PG6Petroleum Liquids0.6September 1995
PG7Petroleum Liquids0.6September 1995
PG8Petroleum Liquids0.9August 2008

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists North Slope Borough Power & Light (AK) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query NSB Point Hope Utility and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near NSB Point Hope Utility

More plants operated by North Slope Borough Power & Light (AK)

Questions about NSB Point Hope Utility

How much power does NSB Point Hope Utility produce?

NSB Point Hope Utility reported 6,678 MWh (6.68 GWh) of net generation in 2025, a 24.6% capacity factor on 3.1 MW of nameplate capacity.

Where is NSB Point Hope Utility?

NSB Point Hope Utility is in North Slope, Alaska, at 68.3484, −166.7372.

Who operates NSB Point Hope Utility?

EIA-860M for August 2026 lists North Slope Borough Power & Light (AK) as the operator (EIA operator ID 26616). The operator is not always the owner.

When did NSB Point Hope Utility start operating?

Its first generator began operating in September 1995, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page