Natural gasOperatingNYISO

Brentwood

Natural gas power plant in Suffolk County, New York. 47 MW of nameplate capacity across 1 generator, operated by New York Power Authority.

Also known as EIA plant 7912

Analyst: free account, 1 question a day.

DennisonNorth CountyRiverheadATT JerichoCohalanBrentwood2 km
Open in the map
6 plants within 8.8 km, from EIA coordinates.

Key facts

Capacity
47 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
July 2001First generator online
Operator
New York Power AuthorityEIA operator ID 15296
Grid
NYISOBalancing authority NYIS
Price nodes
1 NYISO nodeResource nodes with prices
Location
Suffolk County, NY40.7871, −73.2934
EIA plant ID
7912EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Brentwood produces

Free · EIA-923

Net generation, 2025

41.3 GWh

41,326 MWh, final

Capacity factor, 2025

10.0%

2024: 9.1%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

35.5–80.5

GWh a year. Low 2023, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
200298,160Not reported12 of 12
200353,228Not reported12 of 12
200438,774Not reported12 of 12
200593,471Not reported12 of 12
2006109,558Not reported12 of 12
2007106,919Not reported12 of 12
200888,276Not reported12 of 12
200918,611Not reported12 of 12
201067,67016.4%12 of 12
201168,17316.6%12 of 12
201272,26417.5%12 of 12
201378,79319.1%12 of 12
201443,24210.5%12 of 12
201559,03114.3%12 of 12
201652,14312.6%12 of 12
201748,98411.9%12 of 12
201859,44414.4%12 of 12
201950,42312.2%12 of 12
202080,50419.5%12 of 12
202162,62915.2%12 of 12
202267,72316.4%12 of 12
202335,5158.6%12 of 12
202437,4479.1%12 of 12
202541,32610.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

26,312

US short tons. 2024: 24,370

SO₂, 2025

0

US short tons

NOx, 2025

2

US short tons

CO₂ per MWh, calculated

0.64 t

About 1,273 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (BW01), matched to EIA plant 7912 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Natural Gas Fired Combustion Turbine47.0July 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists New York Power Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Brentwood and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Brentwood

More plants operated by New York Power Authority

Questions about Brentwood

How much power does Brentwood produce?

Brentwood reported 41,326 MWh (41.3 GWh) of net generation in 2025, a 10.0% capacity factor on 47 MW of nameplate capacity.

Where is Brentwood?

Brentwood is in Suffolk County, New York, at 40.7871, −73.2934. It is in the New York Independent System Operator balancing area (NYIS).

Who operates Brentwood?

EIA-860M for August 2026 lists New York Power Authority as the operator (EIA operator ID 15296). The operator is not always the owner.

When did Brentwood start operating?

Its first generator began operating in July 2001, according to EIA-860M.

Does InfraMap have power prices for Brentwood?

Yes. InfraMap has NYISO day-ahead and real-time prices at 1 price node linked to Brentwood, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page