Battery storageOperatingNEVP

Reid Gardner

Battery storage project in Clark County, Nevada. 220 MW of nameplate capacity across 1 generator, operated by Nevada Power Co.

Also known as Reid Gardner Storage · EIA plant 2324

Analyst: free account, 1 question a day.

Eagle Shadow Mountain…Moapa Southern PaiuteGemini Solar HybridDry Lake Solar Energy CenterHarry AllenReid Gardner20 km
Open in the map
6 plants within 35 km, from EIA coordinates.

Key facts

Capacity
220 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
December 2023First generator online
Operator
Nevada Power CoEIA operator ID 13407
Grid
NEVPBalancing authority NEVP
Price nodes
None linkedNo verified ISO node
Location
Clark County, NV36.6573, −114.6333
EIA plant ID
2324EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Reid Gardner produces

Free · EIA-923

Net generation, 2025

−29.7 GWh

−29,736 MWh, final

Battery discharge, 2025

164 GWh

Charge 193 GWh

January to July 2026

−18.0 GWh

Provisional

Range, 2015 to 2025

−29.7–397.5

GWh a year. Low 2025, high 2015

Annual net generation, GWh
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20004,238,122Not reported12 of 12
20013,836,069Not reported12 of 12
20024,191,103Not reported12 of 12
20034,100,460Not reported12 of 12
20044,071,644Not reported12 of 12
20053,933,016Not reported12 of 12
20063,752,286Not reported12 of 12
20073,719,914Not reported12 of 12
20083,356,556Not reported12 of 12
2009813,639Not reported3 of 12
20102,752,60849.3%12 of 12
20112,258,17840.5%12 of 12
20121,384,41524.7%12 of 12
20131,373,63224.6%12 of 12
20141,022,13255.7%4 of 12
2015397,53915.4%12 of 12
2016318,17212.3%12 of 12
2017254,41654.2%3 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023Not reportedNot reported0 of 12
2024−25,279Not reported11 of 12
2025−29,736Not reported12 of 12
2026 (provisional, partial year)−17,971Not reported7 of 7

* 2026 covers January to July and is provisional. Battery plants can report negative net generation, when charging uses more energy than they discharge.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2017

382,487

US short tons. 2016: 453,183

SO₂, 2017

168

US short tons

NOx, 2017

389

US short tons

1 of 1 EPA units reported CO₂ in 2017 (1, 2, 3, 4), matched to EIA plant 2324 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
RGES1Batteries220.0December 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Nevada Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Reid Gardner and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Reid Gardner

More plants operated by Nevada Power Co

Questions about Reid Gardner

How much power does Reid Gardner produce?

Reid Gardner reported −29,736 MWh (−29.7 GWh) of net generation in 2025. From January to July 2026 it reported −18.0 GWh, which is provisional.

Where is Reid Gardner?

Reid Gardner is in Clark County, Nevada, at 36.6573, −114.6333. It is in the Nevada Power Company balancing area (NEVP).

Who operates Reid Gardner?

EIA-860M for August 2026 lists Nevada Power Co as the operator (EIA operator ID 13407). The operator is not always the owner.

When did Reid Gardner start operating?

Its first generator began operating in December 2023, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page