Natural gasOperatingDUK

W S Lee

Natural gas power plant in Anderson County, South Carolina. 954.7 MW of nameplate capacity across 5 generators, operated by Duke Energy Carolinas, LLC.

Also known as W.S. Lee Power Plant · W.S. Lee · WS Lee · EIA plant 3264

Analyst: free account, 1 question a day.

Pelzer LowerPelzer UpperPelzer Solar IHollidays Bridge HydroPiedmont Hydro Power ProjectW S Lee5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
954.7 MWNameplate
Generators
5 operatingEIA-860M, August 2026
Operating since
January 2007First generator online
Operator
Duke Energy Carolinas, LLCEIA operator ID 5416
Grid
DUKBalancing authority DUK
Price nodes
None linkedNo verified ISO node
Location
Anderson County, SC34.6022, −82.4350
EIA plant ID
3264EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power W S Lee produces

Free · EIA-923

Net generation, 2025

5.99 TWh

5,985,959 MWh, final

Capacity factor, 2025

71.6%

2024: 67.3%

January to July 2026

3.25 TWh

Provisional

Range, 2016 to 2025

0.1–6.0

TWh a year. Low 2017, high 2020

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20001,390,264Not reported12 of 12
20011,074,238Not reported12 of 12
2002925,685Not reported12 of 12
20031,271,131Not reported9 of 12
20041,123,206Not reported12 of 12
20051,445,536Not reported12 of 12
20061,262,956Not reported12 of 12
20071,534,336Not reported12 of 12
20081,072,017Not reported10 of 12
2009190,223Not reported6 of 12
20101,072,98028.0%12 of 12
2011741,943Not reported12 of 12
2012185,2054.6%12 of 12
201359,7401.5%12 of 12
2014344,728Not reported12 of 12
2015Not reportedNot reported0 of 12
2016284,11811.9%12 of 12
2017127,3935.4%12 of 12
20183,624,759Not reported9 of 12
20195,272,03453.8%12 of 12
20206,032,72061.4%12 of 12
20215,851,69959.8%12 of 12
20224,710,153Not reported12 of 12
20235,961,17771.3%12 of 12
20245,646,36967.3%12 of 12
20255,985,95971.6%12 of 12
2026 (provisional, partial year)3,245,37266.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

2.59M

US short tons. 2024: 2.44M

SO₂, 2025

13

US short tons

NOx, 2025

210

US short tons

CO₂ per MWh, calculated

0.43 t

About 865 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1, 11, 12, 2, 3, 7C, 8C), matched to EIA plant 3264 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

Not reported

million gallons as reported; not used, see note

Consumption, 2024

Not reported

million gallons

Source

Saluda River

Surface, Fresh. Induced-draft tower

Watershed stress

Very low/none · 0.131

USGS SUI, HUC12 Craven Creek-Saluda River

0 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Consumption is below 5% of a large reported withdrawal, so the withdrawal is not used. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
7Natural Gas Fired Combustion Turbine54.0January 2007
8Natural Gas Fired Combustion Turbine54.0January 2007
CT11Natural Gas Fired Combined Cycle242.3April 2018
CT12Natural Gas Fired Combined Cycle242.3April 2018
ST10Natural Gas Fired Combined Cycle362.1April 2018

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Carolinas, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query W S Lee and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near W S Lee

More plants operated by Duke Energy Carolinas, LLC

Questions about W S Lee

How much power does W S Lee produce?

W S Lee reported 5,985,959 MWh (5.99 TWh) of net generation in 2025, a 71.6% capacity factor on 954.7 MW of nameplate capacity. From January to July 2026 it reported 3.25 TWh, which is provisional.

Where is W S Lee?

W S Lee is in Anderson County, South Carolina, at 34.6022, −82.4350. It is in the Duke Energy Carolinas balancing area (DUK).

Who operates W S Lee?

EIA-860M for August 2026 lists Duke Energy Carolinas, LLC as the operator (EIA operator ID 5416). The operator is not always the owner.

When did W S Lee start operating?

Its first generator began operating in January 2007, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page