Natural gasOperatingCAISO

Chula Vista Energy Center

Natural gas power plant in San Diego County, California. 37.2 MW of nameplate capacity across 1 generator, operated by Wellhead Services, Inc.

Also known as EIA plant 55540

Analyst: free account, 1 question a day.

EnerSmart Chula Vista Sub StationCounty of San Diego SBRCLarkspur Energy FacilityChula Vista5 km
Open in the map
6 plants within 11 km, from EIA coordinates.

Key facts

Capacity
37.2 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
May 2001First generator online
Operator
Wellhead Services, IncEIA operator ID 20323
Grid
CAISOBalancing authority CISO
Price nodes
1 CAISO nodeResource nodes with prices
Location
San Diego County, CA32.5917, −117.0586
EIA plant ID
55540EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Chula Vista produces

Free · EIA-923

Net generation, 2025

373 MWh

373 MWh, final

Capacity factor, 2025

0.1%

2024: 0.5%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

0.4–4.8

GWh a year. Low 2025, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
20011,129Not reported12 of 12
20023,959Not reported12 of 12
200317,174Not reported9 of 12
20040Not reported12 of 12
20050Not reported12 of 12
20063,844Not reported12 of 12
20071,842Not reported12 of 12
20081,921Not reported12 of 12
20093,615Not reported12 of 12
2010906Not reported12 of 12
20111,1090.3%12 of 12
20122,4720.6%12 of 12
20135110.1%12 of 12
20149050.2%12 of 12
20151,1380.3%12 of 12
20164,8471.3%12 of 12
20173,1870.8%12 of 12
20183,0700.8%12 of 12
20193,8851.0%12 of 12
20202,399Not reported12 of 12
20214,8001.5%12 of 12
20222,0160.6%12 of 12
20231,7320.5%12 of 12
20241,7340.5%12 of 12
20253730.1%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

CO₂, 2025

384

US short tons. 2024: 1,766

SO₂, 2025

0

US short tons

NOx, 2025

0

US short tons

CO₂ per MWh, calculated

1.03 t

About 2,057 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (1A, 1B), matched to EIA plant 55540 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GEN1Natural Gas Fired Combustion Turbine37.2May 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Wellhead Services, Inc as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Chula Vista Energy Center and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Chula Vista

More plants operated by Wellhead Services, Inc

Questions about Chula Vista

How much power does Chula Vista Energy Center produce?

Chula Vista Energy Center reported 373 MWh (373 MWh) of net generation in 2025, a 0.1% capacity factor on 37.2 MW of nameplate capacity.

Where is Chula Vista Energy Center?

Chula Vista Energy Center is in San Diego County, California, at 32.5917, −117.0586. It is in the California Independent System Operator balancing area (CISO).

Who operates Chula Vista Energy Center?

EIA-860M for August 2026 lists Wellhead Services, Inc as the operator (EIA operator ID 20323). The operator is not always the owner.

When did Chula Vista Energy Center start operating?

Its first generator began operating in May 2001, according to EIA-860M.

Does InfraMap have power prices for Chula Vista Energy Center?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Chula Vista Energy Center, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page