Natural gasOperatingMISO

Magnet Cove

Natural gas power plant in Hot Spring County, Arkansas. 746 MW of nameplate capacity across 3 generators, operated by Arkansas Electric Coop Corp.

Also known as Magnet Cove Generating Station · EIA plant 55714

Analyst: free account, 1 question a day.

Hot Spring Generating FacilityCarpenterDegrayMagnet Cove20 km
Open in the map
6 plants within 35 km, from EIA coordinates.

Key facts

Capacity
746 MWNameplate
Generators
3 operatingEIA-860M, August 2026
Operating since
July 2005First generator online
Operator
Arkansas Electric Coop CorpEIA operator ID 807
Grid
MISOBalancing authority MISO
Price nodes
4 MISO nodesResource nodes with prices
Location
Hot Spring County, AR34.4297, −92.8317
EIA plant ID
55714EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Magnet Cove produces

Free · EIA-923

Net generation, 2025

3.59 TWh

3,593,788 MWh, final

Capacity factor, 2025

55.0%

2024: 65.0%

January to July 2026

2.50 TWh

Provisional

Range, 2015 to 2025

0.7–4.3

TWh a year. Low 2015, high 2024

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005452,429Not reported12 of 12
20061,474,438Not reported12 of 12
20071,661,335Not reported12 of 12
20082,004,043Not reported12 of 12
20092,778,256Not reported12 of 12
20101,826,38327.9%12 of 12
2011608,2129.3%12 of 12
20122,578,52139.3%12 of 12
20131,098,071Not reported12 of 12
2014131,8592.0%12 of 12
2015712,90910.9%12 of 12
20162,046,99431.2%12 of 12
20171,380,83521.1%12 of 12
20181,834,88528.1%12 of 12
20191,705,57826.1%12 of 12
20201,711,24726.1%12 of 12
20211,264,69319.4%12 of 12
20223,311,47250.7%12 of 12
20233,377,78251.7%12 of 12
20244,259,46365.0%12 of 12
20253,593,78855.0%12 of 12
2026 (provisional, partial year)2,504,13166.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

1.50M

US short tons. 2024: 1.75M

SO₂, 2025

8

US short tons

NOx, 2025

164

US short tons

CO₂ per MWh, calculated

0.42 t

About 833 lb per MWh

2 of 2 EPA units reported CO₂ in 2025 (SN-01, SN-02), matched to EIA plant 55714 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

841

million gallons

Consumption, 2024

837

million gallons

Source

Ouachita River

Surface, Fresh. Induced-draft tower

Watershed stress

Low · 0.225

USGS SUI, HUC12 Stone Quarry Creek-Ouachita River

12 of 12 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
GT1Natural Gas Fired Combined Cycle242.0July 2005
GT2Natural Gas Fired Combined Cycle242.0January 2006
ST1Natural Gas Fired Combined Cycle262.0July 2005

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arkansas Electric Coop Corp as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Magnet Cove and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Magnet Cove

More plants operated by Arkansas Electric Coop Corp

Questions about Magnet Cove

How much power does Magnet Cove produce?

Magnet Cove reported 3,593,788 MWh (3.59 TWh) of net generation in 2025, a 55.0% capacity factor on 746 MW of nameplate capacity. From January to July 2026 it reported 2.50 TWh, which is provisional.

Where is Magnet Cove?

Magnet Cove is in Hot Spring County, Arkansas, at 34.4297, −92.8317. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Magnet Cove?

EIA-860M for August 2026 lists Arkansas Electric Coop Corp as the operator (EIA operator ID 807). The operator is not always the owner.

When did Magnet Cove start operating?

Its first generator began operating in July 2005, according to EIA-860M.

Does InfraMap have power prices for Magnet Cove?

Yes. InfraMap has MISO day-ahead and real-time prices at 4 price nodes linked to Magnet Cove, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page