Chino Valley Solar

Solar and battery storage project in Yavapai County, Arizona. 38 MW of nameplate capacity across 2 generators, operated by Arizona Public Service Co.

Also known as Chino Solar Valley · EIA plant 57560

This project groups Chino Valley Solar (EIA 57560). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Prescott AirportPrescott Solar PlantChino Valley Solar2 km
Open in the map
2 plants within 7.7 km, from EIA coordinates.

Key facts

Capacity
38 MWSolar 19.0 · Battery storage 19.0
Generators
2 operatingEIA-860M, August 2026
Operating since
December 2012First generator online
Operator
Arizona Public Service CoEIA operator ID 803
Grid
AZPSBalancing authority AZPS
Price nodes
1 CAISO nodeResource nodes with prices
Location
Yavapai County, AZ34.7184, −112.4290
EIA plant ID
57560EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Chino Valley Solar produces

Free · EIA-923

Net generation, 2025

33.1 GWh

33,083 MWh, final

Capacity factor, 2025

21.9%

2024: Not reported

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

26.3–49.0

GWh a year. Low 2023, high 2020

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
20126,292Not reported1 of 12
201349,479Not reported12 of 12
201447,09028.3%12 of 12
201546,47627.9%12 of 12
201645,73427.4%12 of 12
201741,73825.1%12 of 12
201844,57826.8%12 of 12
201944,82626.9%12 of 12
202048,97229.3%12 of 12
202146,77028.1%12 of 12
202248,10028.9%12 of 12
202326,26915.8%12 of 12
202441,027Not reported12 of 12
202533,08321.9%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
CV19MBatteries19.0January 2024
PV1Solar Photovoltaic19.0December 2012

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Arizona Public Service Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Chino Valley Solar and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Chino Valley Solar

More plants operated by Arizona Public Service Co

Questions about Chino Valley Solar

How much power does Chino Valley Solar produce?

Chino Valley Solar reported 33,083 MWh (33.1 GWh) of net generation in 2025, a 21.9% capacity factor on 38 MW of nameplate capacity.

Where is Chino Valley Solar?

Chino Valley Solar is in Yavapai County, Arizona, at 34.7184, −112.4290. It is in the Arizona Public Service Company balancing area (AZPS).

Who operates Chino Valley Solar?

EIA-860M for August 2026 lists Arizona Public Service Co as the operator (EIA operator ID 803). The operator is not always the owner.

Is Chino Valley Solar a solar or a battery storage plant?

Both. Solar capacity totals 19 MW and battery storage capacity totals 19 MW.

When did Chino Valley Solar start operating?

Its first generator began operating in December 2012, according to EIA-860M.

Does InfraMap have power prices for Chino Valley Solar?

Yes. InfraMap has CAISO day-ahead and real-time prices at 1 price node linked to Chino Valley Solar, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page