Linden Wind Energy Project
Wind power plant in Klickitat County, Washington. 50 MW of nameplate capacity across 1 generator, operated by Los Angeles Department of Water & Power.
Also known as Linden Project · Linden · EIA plant 57635
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 50 MWNameplate
- Generators
- 1 operatingEIA-860M, August 2026
- Operating since
- June 2010First generator online
- Operator
- Los Angeles Department of Water & PowerEIA operator ID 11208
- Grid
- BPATBalancing authority BPAT
- Price nodes
- None linkedNo verified ISO node
- Location
- Klickitat County, WA45.7442, −120.7836
- EIA plant ID
- 57635EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Linden Wind Energy Project produces
Free · EIA-923Net generation, 2025
104 GWh
104,333 MWh, final
Capacity factor, 2025
23.8%
2024: 22.0%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
96.5–142.5
GWh a year. Low 2024, high 2016
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | Not reported | Not reported | 0 of 12 |
| 2005 | Not reported | Not reported | 0 of 12 |
| 2006 | Not reported | Not reported | 0 of 12 |
| 2007 | Not reported | Not reported | 0 of 12 |
| 2008 | Not reported | Not reported | 0 of 12 |
| 2009 | Not reported | Not reported | 0 of 12 |
| 2010 | Not reported | Not reported | 0 of 12 |
| 2011 | 151,229 | 34.5% | 12 of 12 |
| 2012 | 141,598 | 32.2% | 12 of 12 |
| 2013 | 149,226 | 34.1% | 12 of 12 |
| 2014 | 147,475 | 33.7% | 12 of 12 |
| 2015 | 132,595 | 30.3% | 12 of 12 |
| 2016 | 142,458 | 32.4% | 12 of 12 |
| 2017 | 119,098 | 27.2% | 12 of 12 |
| 2018 | 139,555 | 31.9% | 12 of 12 |
| 2019 | 123,466 | 28.2% | 12 of 12 |
| 2020 | 105,189 | 24.0% | 12 of 12 |
| 2021 | 122,562 | 28.0% | 12 of 12 |
| 2022 | 119,226 | 27.2% | 12 of 12 |
| 2023 | 116,694 | 26.6% | 12 of 12 |
| 2024 | 96,525 | 22.0% | 12 of 12 |
| 2025 | 104,333 | 23.8% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| LW1 | Onshore Wind Turbine | 50.0 | June 2010 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Los Angeles Department of Water & Power as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Modeled curtailment
A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.
Expected vs reported generation
Monthly modeled expected output and physical potential next to EIA-923 reported output.
300 analyst questions a month, plus MCP
Query Linden Wind Energy Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Linden Wind Energy Project
More plants operated by Los Angeles Department of Water & Power
Questions about Linden Wind Energy Project
How much power does Linden Wind Energy Project produce?
Linden Wind Energy Project reported 104,333 MWh (104 GWh) of net generation in 2025, a 23.8% capacity factor on 50 MW of nameplate capacity.
Where is Linden Wind Energy Project?
Linden Wind Energy Project is in Klickitat County, Washington, at 45.7442, −120.7836. It is in the Bonneville Power Administration balancing area (BPAT).
Who operates Linden Wind Energy Project?
EIA-860M for August 2026 lists Los Angeles Department of Water & Power as the operator (EIA operator ID 11208). The operator is not always the owner.
When did Linden Wind Energy Project start operating?
Its first generator began operating in June 2010, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
- Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
- Project names from the USGS U.S. Wind Turbine Database
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page