WindOperatingBPAT

Linden Wind Energy Project

Wind power plant in Klickitat County, Washington. 50 MW of nameplate capacity across 1 generator, operated by Los Angeles Department of Water & Power.

Also known as Linden Project · Linden · EIA plant 57635

Analyst: free account, 1 question a day.

Windy Flats Wind ProjectJohn DayGoldendale Generating StationWashington WindBiglow Canyon Wind FarmPaTu Wind Farm LLCLinden Wind Energy Project10 km
Open in the map
6 plants within 20 km, from EIA coordinates.

Key facts

Capacity
50 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
June 2010First generator online
Operator
Los Angeles Department of Water & PowerEIA operator ID 11208
Grid
BPATBalancing authority BPAT
Price nodes
None linkedNo verified ISO node
Location
Klickitat County, WA45.7442, −120.7836
EIA plant ID
57635EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Linden Wind Energy Project produces

Free · EIA-923

Net generation, 2025

104 GWh

104,333 MWh, final

Capacity factor, 2025

23.8%

2024: 22.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

96.5–142.5

GWh a year. Low 2024, high 2016

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011151,22934.5%12 of 12
2012141,59832.2%12 of 12
2013149,22634.1%12 of 12
2014147,47533.7%12 of 12
2015132,59530.3%12 of 12
2016142,45832.4%12 of 12
2017119,09827.2%12 of 12
2018139,55531.9%12 of 12
2019123,46628.2%12 of 12
2020105,18924.0%12 of 12
2021122,56228.0%12 of 12
2022119,22627.2%12 of 12
2023116,69426.6%12 of 12
202496,52522.0%12 of 12
2025104,33323.8%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
LW1Onshore Wind Turbine50.0June 2010

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Los Angeles Department of Water & Power as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Linden Wind Energy Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Linden Wind Energy Project

More plants operated by Los Angeles Department of Water & Power

Questions about Linden Wind Energy Project

How much power does Linden Wind Energy Project produce?

Linden Wind Energy Project reported 104,333 MWh (104 GWh) of net generation in 2025, a 23.8% capacity factor on 50 MW of nameplate capacity.

Where is Linden Wind Energy Project?

Linden Wind Energy Project is in Klickitat County, Washington, at 45.7442, −120.7836. It is in the Bonneville Power Administration balancing area (BPAT).

Who operates Linden Wind Energy Project?

EIA-860M for August 2026 lists Los Angeles Department of Water & Power as the operator (EIA operator ID 11208). The operator is not always the owner.

When did Linden Wind Energy Project start operating?

Its first generator began operating in June 2010, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)
  • Project names from the USGS U.S. Wind Turbine Database

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page