Key facts

Capacity
75 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
November 2013First generator online
Operator
Berlin Station, LLCEIA operator ID 57430
Grid
ISO-NEBalancing authority ISNE
Price nodes
1 ISONE nodeResource nodes with prices
Location
Coos County, NH44.4719, −71.1753
EIA plant ID
58054EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Burgess BioPower produces

Free · EIA-923

Net generation, 2025

390 GWh

390,190 MWh, final

Capacity factor, 2025

59.4%

2024: 52.9%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

348.6–540.6

GWh a year. Low 2024, high 2021

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
201316,444Not reported2 of 12
2014285,33543.4%12 of 12
2015421,45764.1%12 of 12
2016525,12879.7%12 of 12
2017492,72775.0%12 of 12
2018499,25176.0%12 of 12
2019538,91482.0%12 of 12
2020514,73378.1%12 of 12
2021540,63682.3%12 of 12
2022540,58182.3%12 of 12
2023496,18975.5%12 of 12
2024348,59252.9%12 of 12
2025390,19059.4%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · ISONE

Emissions

Free · EPA CAMPD

CO₂, 2025

642,406

US short tons. 2024: 607,078

SO₂, 2025

14

US short tons

NOx, 2025

183

US short tons

CO₂ per MWh, calculated

1.65 t

About 3,293 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (ST01), matched to EIA plant 58054 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
ST01Wood/Wood Waste Biomass75.0November 2013

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Berlin Station, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Burgess BioPower and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Burgess BioPower

Questions about Burgess BioPower

How much power does Burgess BioPower produce?

Burgess BioPower reported 390,190 MWh (390 GWh) of net generation in 2025, a 59.4% capacity factor on 75 MW of nameplate capacity.

Where is Burgess BioPower?

Burgess BioPower is in Coos County, New Hampshire, at 44.4719, −71.1753. It is in the ISO New England Inc. balancing area (ISNE).

Who operates Burgess BioPower?

EIA-860M for August 2026 lists Berlin Station, LLC as the operator (EIA operator ID 57430). The operator is not always the owner.

When did Burgess BioPower start operating?

Its first generator began operating in November 2013, according to EIA-860M.

Does InfraMap have power prices for Burgess BioPower?

Yes. InfraMap has ISONE day-ahead and real-time prices at 1 price node linked to Burgess BioPower, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • ISONE day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page