CoalOperatingSOCO

James H Miller Jr

Coal power plant in Jefferson County, Alabama. 2,822 MW of nameplate capacity across 4 generators, operated by Alabama Power Co.

Also known as James H. Miller Electric Generating Plant · EIA plant 6002

Analyst: free account, 1 question a day.

ABC CokeBankhead DamLewis Smith DamHolt DamJames H Miller Jr25 km
Open in the map
4 plants within 55 km, from EIA coordinates.

Key facts

Capacity
2,822 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
October 1978First generator online
Operator
Alabama Power CoEIA operator ID 195
Grid
SOCOBalancing authority SOCO
Price nodes
None linkedNo verified ISO node
Location
Jefferson County, AL33.6319, −87.0597
EIA plant ID
6002EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power James H Miller Jr produces

Free · EIA-923

Net generation, 2025

19.0 TWh

19,017,972 MWh, final

Capacity factor, 2025

76.9%

2024: 75.0%

January to July 2026

10.8 TWh

Provisional

Range, 2015 to 2025

17.8–21.1

TWh a year. Low 2015, high 2022

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200020,419,012Not reported12 of 12
200118,526,033Not reported12 of 12
200218,592,131Not reported12 of 12
200319,310,534Not reported12 of 12
200419,500,172Not reported12 of 12
200521,328,867Not reported12 of 12
200621,658,406Not reported12 of 12
200721,896,930Not reported12 of 12
200821,372,796Not reported12 of 12
200920,815,258Not reported12 of 12
201020,621,63583.4%12 of 12
201120,649,09583.5%12 of 12
201217,625,76771.1%12 of 12
201320,446,09982.7%12 of 12
20142,672,10164.7%2 of 12
201517,815,89172.1%12 of 12
201618,193,03973.4%12 of 12
201719,029,94777.0%12 of 12
201813,871,99274.8%9 of 12
201918,490,94874.8%12 of 12
20208,485,88858.8%7 of 12
202120,528,96583.0%12 of 12
202221,067,41385.2%12 of 12
20232,645,40864.0%2 of 12
202418,597,29275.0%12 of 12
202519,017,97276.9%12 of 12
2026 (provisional, partial year)10,763,99275.0%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

21.35M

US short tons. 2024: 20.80M

SO₂, 2025

900

US short tons

NOx, 2025

6,358

US short tons

CO₂ per MWh, calculated

1.12 t

About 2,246 lb per MWh

4 of 4 EPA units reported CO₂ in 2025 (1, 2, 3, 4), matched to EIA plant 6002 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

12,186

million gallons

Consumption, 2024

9,859

million gallons

Source

Black Warrior River

Surface, Fresh. Natural-draft tower

Watershed stress

Low · 0.399

USGS SUI, HUC12 Lower Village Creek

24 of 24 cooling months report withdrawal. SUI of the HUC12 containing the plant. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal705.5October 1978
2Conventional Steam Coal705.5May 1985
3Conventional Steam Coal705.5May 1989
4Conventional Steam Coal705.5March 1991

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Alabama Power Co as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query James H Miller Jr and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near James H Miller Jr

More plants operated by Alabama Power Co

Questions about James H Miller Jr

How much power does James H Miller Jr produce?

James H Miller Jr reported 19,017,972 MWh (19.0 TWh) of net generation in 2025, a 76.9% capacity factor on 2,822 MW of nameplate capacity. From January to July 2026 it reported 10.8 TWh, which is provisional.

Where is James H Miller Jr?

James H Miller Jr is in Jefferson County, Alabama, at 33.6319, −87.0597. It is in the Southern Company Services, Inc. - Trans balancing area (SOCO).

Who operates James H Miller Jr?

EIA-860M for August 2026 lists Alabama Power Co as the operator (EIA operator ID 195). The operator is not always the owner.

When did James H Miller Jr start operating?

Its first generator began operating in October 1978, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page