SolarBattery storageOperatingCAISO

Oberon Solar Project

Solar and battery storage project in Riverside County, California. 375 MW of nameplate capacity across 2 generators, operated by Intersect USA, LLC.

Also known as EIA plant 65734

This project groups Oberon Solar Project (EIA 65734). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Maverick Solar 6, LLCAthos Solar ProjectOberon Solar Project2 km
Open in the map
6 plants within 3.5 km, from EIA coordinates.

Key facts

Capacity
375 MWSolar 250.0 · Battery storage 125.0
Generators
2 operatingEIA-860M, August 2026
Operating since
September 2023First generator online
Operator
Intersect USA, LLCEIA operator ID 67582
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
Riverside County, CA33.7290, −115.3824
EIA plant ID
65734EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Oberon Solar Project produces

Free · EIA-923

Net generation, 2025

581 GWh

581,451 MWh, final

Capacity factor, 2025

27.4%

2024: 24.6%

January to July 2026

335 GWh

Provisional

Range, 2024 to 2025

522.3–581.5

GWh a year. Low 2024, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
2023173,721Not reported4 of 12
2024522,34724.6%12 of 12
2025581,45127.4%12 of 12
2026 (provisional, partial year)334,72627.2%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
OBIBSBatteries125.0September 2023
OBIPVSolar Photovoltaic250.0September 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Intersect USA, LLC as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Oberon Solar Project and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Oberon Solar Project

More plants operated by Intersect USA, LLC

Questions about Oberon Solar Project

How much power does Oberon Solar Project produce?

Oberon Solar Project reported 581,451 MWh (581 GWh) of net generation in 2025, a 27.4% capacity factor on 375 MW of nameplate capacity. From January to July 2026 it reported 335 GWh, which is provisional.

Where is Oberon Solar Project?

Oberon Solar Project is in Riverside County, California, at 33.7290, −115.3824. It is in the California Independent System Operator balancing area (CISO).

Who operates Oberon Solar Project?

EIA-860M for August 2026 lists Intersect USA, LLC as the operator (EIA operator ID 67582). The operator is not always the owner.

Is Oberon Solar Project a solar or a battery storage plant?

Both. Solar capacity totals 250 MW and battery storage capacity totals 125 MW.

When did Oberon Solar Project start operating?

Its first generator began operating in September 2023, according to EIA-860M.

Does InfraMap have power prices for Oberon Solar Project?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Oberon Solar Project, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page