OilOperatingMISO

Moberly

Oil power plant in Randolph County, Missouri. 60.6 MW of nameplate capacity across 1 generator, operated by Union Electric Co - (MO).

Also known as Moberly Power Plant · EIA plant 6651

Analyst: free account, 1 question a day.

Thomas HillAltona Solar, LLCMacon Energy CenterMacon Solar Power ProjectShelbina Power #3Moberly20 km
Open in the map
6 plants within 48 km, from EIA coordinates.

Key facts

Capacity
60.6 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 1978First generator online
Operator
Union Electric Co - (MO)EIA operator ID 19436
Grid
MISOBalancing authority MISO
Price nodes
1 MISO nodeResource nodes with prices
Location
Randolph County, MO39.4244, −92.4837
EIA plant ID
6651EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Moberly produces

Free · EIA-923

Net generation, 2025

257 MWh

257 MWh, final

Capacity factor, 2025

0.0%

2024: 0.0%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

−0.3–2.1

GWh a year. Low 2017, high 2019

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
20003,353Not reported12 of 12
20011,192Not reported12 of 12
2002618Not reported12 of 12
20032,528Not reported11 of 12
2004749Not reported12 of 12
2005139Not reported12 of 12
20062,432Not reported12 of 12
2007−132Not reported12 of 12
200831Not reported12 of 12
2009−370Not reported12 of 12
20103630.1%12 of 12
20111580.0%12 of 12
20121,3900.3%12 of 12
2013220.0%12 of 12
20145470.1%12 of 12
2015−198-0.0%12 of 12
2016−195-0.0%12 of 12
2017−299-0.1%12 of 12
20182790.1%12 of 12
20192,1250.4%12 of 12
20203490.1%12 of 12
20212,1030.4%12 of 12
2022−122-0.0%12 of 12
2023300.0%12 of 12
2024340.0%12 of 12
20252570.0%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · MISO

Emissions

Free · EPA CAMPD

CO₂, 2025

Not reported

US short tons. 2024: Not reported

SO₂, 2025

2

US short tons

NOx, 2025

5

US short tons

0 of 1 EPA units reported CO₂ in 2025 (CT01), matched to EIA plant 6651 through the EPA–EIA crosswalk.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Petroleum Liquids60.6August 1978

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Union Electric Co - (MO) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Moberly and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Moberly

More plants operated by Union Electric Co - (MO)

Questions about Moberly

How much power does Moberly produce?

Moberly reported 257 MWh (257 MWh) of net generation in 2025, a 0.0% capacity factor on 60.6 MW of nameplate capacity.

Where is Moberly?

Moberly is in Randolph County, Missouri, at 39.4244, −92.4837. It is in the Midcontinent Independent Transmission System Operator, Inc.. balancing area (MISO).

Who operates Moberly?

EIA-860M for August 2026 lists Union Electric Co - (MO) as the operator (EIA operator ID 19436). The operator is not always the owner.

When did Moberly start operating?

Its first generator began operating in August 1978, according to EIA-860M.

Does InfraMap have power prices for Moberly?

Yes. InfraMap has MISO day-ahead and real-time prices at 1 price node linked to Moberly, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • MISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page