SolarBattery storageOperatingCAISO

Lockhart Solar PV II

Solar and battery storage project in San Bernardino County, California. 144.1 MW of nameplate capacity across 2 generators, operated by Terra-Gen Operating Co-Solar.

Also known as EIA plant 66699

This project groups Lockhart Solar PV II (EIA 66699). EIA reports them as separate plants.

Analyst: free account, 1 question a day.

Desert Breeze Solar, LLCLockhart ESS, LLCLockhart Solar PV IV, LLCMojave Solar ProjectLockhart Solar PV II1 km
Open in the map
5 plants within 3.0 km, from EIA coordinates.

Key facts

Capacity
144.1 MWSolar 84.4 · Battery storage 59.7
Generators
2 operatingEIA-860M, August 2026
Operating since
July 2023First generator online
Operator
Terra-Gen Operating Co-SolarEIA operator ID 61950
Grid
CAISOBalancing authority CISO
Price nodes
2 CAISO nodesResource nodes with prices
Location
San Bernardino County, CA35.0435, −117.3489
EIA plant ID
66699EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Lockhart Solar PV II produces

Free · EIA-923

Net generation, 2025

52.2 GWh

52,189 MWh, final. 4 of 12 months reported

Capacity factor, 2025

Not reported

2024: 25.0%

January to July 2026

126 GWh

Provisional

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
2002Not reportedNot reported0 of 12
2003Not reportedNot reported0 of 12
2004Not reportedNot reported0 of 12
2005Not reportedNot reported0 of 12
2006Not reportedNot reported0 of 12
2007Not reportedNot reported0 of 12
2008Not reportedNot reported0 of 12
2009Not reportedNot reported0 of 12
2010Not reportedNot reported0 of 12
2011Not reportedNot reported0 of 12
2012Not reportedNot reported0 of 12
2013Not reportedNot reported0 of 12
2014Not reportedNot reported0 of 12
2015Not reportedNot reported0 of 12
2016Not reportedNot reported0 of 12
2017Not reportedNot reported0 of 12
2018Not reportedNot reported0 of 12
2019Not reportedNot reported0 of 12
2020Not reportedNot reported0 of 12
2021Not reportedNot reported0 of 12
2022Not reportedNot reported0 of 12
202397,34323.6%6 of 12
2024185,58425.0%12 of 12
202552,189Not reported4 of 12
2026 (provisional, partial year)125,70930.8%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · CAISO

Emissions

Free · EPA CAMPD

No EPA emissions units are linked to this plant.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024. Plants without steam cooling, such as wind, solar and batteries, do not report cooling water.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
LHC2Batteries59.7November 2025
LOC2Solar Photovoltaic84.4July 2023

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Terra-Gen Operating Co-Solar as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Modeled curtailment

A range, not one number. The lower bound counts hours inside the production tax credit window; the upper bound is the no-credit case.

Modeled

Expected vs reported generation

Monthly modeled expected output and physical potential next to EIA-923 reported output.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Lockhart Solar PV II and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Lockhart Solar PV II

More plants operated by Terra-Gen Operating Co-Solar

Questions about Lockhart Solar PV II

How much power does Lockhart Solar PV II produce?

Lockhart Solar PV II reported 52,189 MWh (52.2 GWh) of net generation in 2025. From January to July 2026 it reported 126 GWh, which is provisional. 4 of 12 months were reported for 2025.

Where is Lockhart Solar PV II?

Lockhart Solar PV II is in San Bernardino County, California, at 35.0435, −117.3489. It is in the California Independent System Operator balancing area (CISO).

Who operates Lockhart Solar PV II?

EIA-860M for August 2026 lists Terra-Gen Operating Co-Solar as the operator (EIA operator ID 61950). The operator is not always the owner.

Is Lockhart Solar PV II a solar or a battery storage plant?

Both. Solar capacity totals 84.4 MW and battery storage capacity totals 59.7 MW.

When did Lockhart Solar PV II start operating?

Its first generator began operating in July 2023, according to EIA-860M.

Does InfraMap have power prices for Lockhart Solar PV II?

Yes. InfraMap has CAISO day-ahead and real-time prices at 2 price nodes linked to Lockhart Solar PV II, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • CAISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page