Dover Peaking
Oil power plant in Tuscarawas County, Ohio. 10.8 MW of nameplate capacity across 6 generators, operated by American Mun Power-Ohio, Inc.
Also known as EIA plant 7777
Analyst: free account, 1 question a day.
Key facts
- Capacity
- 10.8 MWNameplate
- Generators
- 6 operatingEIA-860M, August 2026
- Operating since
- July 1999First generator online
- Operator
- American Mun Power-Ohio, IncEIA operator ID 40577
- Grid
- PJMBalancing authority PJM
- Price nodes
- None linkedNo verified ISO node
- Location
- Tuscarawas County, OH40.5416, −81.4985
- EIA plant ID
- 7777EIA plant page
Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.
How much power Dover Peaking produces
Free · EIA-923Net generation, 2025
547 MWh
547 MWh, final
Capacity factor, 2025
0.6%
2024: 0.4%
January to July 2026
Not reported
Provisional. 0 of 7 months reported
Range, 2015 to 2025
134.0–742.0
MWh a year. Low 2023, high 2021
| Year | Net generation, MWh | Capacity factor | Months reported |
|---|---|---|---|
| 2000 | Not reported | Not reported | 0 of 12 |
| 2001 | Not reported | Not reported | 0 of 12 |
| 2002 | Not reported | Not reported | 0 of 12 |
| 2003 | Not reported | Not reported | 0 of 12 |
| 2004 | 378 | Not reported | 12 of 12 |
| 2005 | 968 | Not reported | 12 of 12 |
| 2006 | 583 | Not reported | 12 of 12 |
| 2007 | 583 | Not reported | 12 of 12 |
| 2008 | 49 | Not reported | 12 of 12 |
| 2009 | 86 | Not reported | 12 of 12 |
| 2010 | 114 | 0.1% | 12 of 12 |
| 2011 | 268 | 0.3% | 12 of 12 |
| 2012 | 310 | 0.3% | 12 of 12 |
| 2013 | 252 | 0.3% | 12 of 12 |
| 2014 | 151 | 0.2% | 12 of 12 |
| 2015 | 395 | 0.4% | 12 of 12 |
| 2016 | 655 | 0.7% | 12 of 12 |
| 2017 | 355 | 0.4% | 12 of 12 |
| 2018 | 577 | 0.6% | 12 of 12 |
| 2019 | 441 | 0.5% | 12 of 12 |
| 2020 | 540 | 0.6% | 12 of 12 |
| 2021 | 742 | 0.8% | 12 of 12 |
| 2022 | 471 | 0.5% | 12 of 12 |
| 2023 | 134 | 0.1% | 12 of 12 |
| 2024 | 402 | 0.4% | 12 of 12 |
| 2025 | 547 | 0.6% | 12 of 12 |
| 2026 (provisional, partial year) | Not reported | Not reported | 0 of 7 |
* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.
Power prices and basis
Free accountNo verified ISO price node is linked to this plant, or its price history could not load.
Emissions
Free · EPA CAMPDNo EPA emissions units are linked to this plant.
Water use
Free · EIA-923 cooling, USGSNo EIA cooling-water record for this plant in 2024.
Generators
Free · EIA-860M| Generator | Technology | Nameplate MW | Online since |
|---|---|---|---|
| 1 | Petroleum Liquids | 1.8 | July 1999 |
| 2 | Petroleum Liquids | 1.8 | July 1999 |
| 3 | Petroleum Liquids | 1.8 | July 1999 |
| 4 | Petroleum Liquids | 1.8 | July 1999 |
| 5 | Petroleum Liquids | 1.8 | July 1999 |
| 6 | Petroleum Liquids | 1.8 | July 1999 |
Ownership and offtake
ProOwnership and offtake are part of Pro
Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists American Mun Power-Ohio, Inc as the operator, which is not always the owner.
Modeled data
ProPro adds modeled values for this plant. Everything above stays free.
Generation potential vs reported
Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.
300 analyst questions a month, plus MCP
Query Dover Peaking and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.
Power plants near Dover Peaking
More plants operated by American Mun Power-Ohio, Inc
Questions about Dover Peaking
How much power does Dover Peaking produce?
Dover Peaking reported 547 MWh (547 MWh) of net generation in 2025, a 0.6% capacity factor on 10.8 MW of nameplate capacity.
Where is Dover Peaking?
Dover Peaking is in Tuscarawas County, Ohio, at 40.5416, −81.4985. It is in the PJM Interconnection, LLC balancing area (PJM).
Who operates Dover Peaking?
EIA-860M for August 2026 lists American Mun Power-Ohio, Inc as the operator (EIA operator ID 40577). The operator is not always the owner.
When did Dover Peaking start operating?
Its first generator began operating in July 1999, according to EIA-860M.
Sources
- EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
- EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page