Natural gasOperatingNYISO

North 1st

Natural gas power plant in Kings County, New York. 47 MW of nameplate capacity across 1 generator, operated by New York Power Authority.

Also known as North 1st power station · EIA plant 7915

Analyst: free account, 1 question a day.

East RiverBrooklyn Navy Yard CogenerationAE-ESS NWS 1, LLCNYU LANGONE HEALTHOak OrchardVernon BoulevardNorth 1st2 km
Open in the map
6 plants within 4.3 km, from EIA coordinates.

Key facts

Capacity
47 MWNameplate
Generators
1 operatingEIA-860M, August 2026
Operating since
August 2001First generator online
Operator
New York Power AuthorityEIA operator ID 15296
Grid
NYISOBalancing authority NYIS
Price nodes
1 NYISO nodeResource nodes with prices
Location
Kings County, NY40.7171, −73.9664
EIA plant ID
7915EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power North 1st produces

Free · EIA-923

Net generation, 2025

92.8 GWh

92,786 MWh, final

Capacity factor, 2025

22.5%

2024: 16.4%

January to July 2026

Not reported

Provisional. 0 of 7 months reported

Range, 2015 to 2025

29.4–92.8

GWh a year. Low 2019, high 2025

Annual net generation, GWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
2000Not reportedNot reported0 of 12
2001Not reportedNot reported0 of 12
200229,418Not reported12 of 12
200378,314Not reported12 of 12
200476,341Not reported12 of 12
2005105,725Not reported12 of 12
200682,934Not reported12 of 12
2007114,615Not reported12 of 12
200875,975Not reported12 of 12
200913,104Not reported12 of 12
201054,74613.3%12 of 12
201183,92920.4%12 of 12
201248,76111.8%12 of 12
201350,11612.2%12 of 12
201440,0219.7%12 of 12
201535,5698.6%12 of 12
201645,60511.0%12 of 12
201737,3629.1%12 of 12
201851,87112.6%12 of 12
201929,3727.1%12 of 12
202047,08911.4%12 of 12
202133,7178.2%12 of 12
202270,73817.2%12 of 12
202331,5357.7%12 of 12
202467,64116.4%12 of 12
202592,78622.5%12 of 12
2026 (provisional, partial year)Not reportedNot reported0 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account · NYISO

Emissions

Free · EPA CAMPD

CO₂, 2025

57,820

US short tons. 2024: 42,499

SO₂, 2025

0

US short tons

NOx, 2025

4

US short tons

CO₂ per MWh, calculated

0.62 t

About 1,246 lb per MWh

1 of 1 EPA units reported CO₂ in 2025 (NO1), matched to EIA plant 7915 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

No EIA cooling-water record for this plant in 2024.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
N01Natural Gas Fired Combustion Turbine47.0August 2001

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists New York Power Authority as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query North 1st and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near North 1st

More plants operated by New York Power Authority

Questions about North 1st

How much power does North 1st produce?

North 1st reported 92,786 MWh (92.8 GWh) of net generation in 2025, a 22.5% capacity factor on 47 MW of nameplate capacity.

Where is North 1st?

North 1st is in Kings County, New York, at 40.7171, −73.9664. It is in the New York Independent System Operator balancing area (NYIS).

Who operates North 1st?

EIA-860M for August 2026 lists New York Power Authority as the operator (EIA operator ID 15296). The operator is not always the owner.

When did North 1st start operating?

Its first generator began operating in August 2001, according to EIA-860M.

Does InfraMap have power prices for North 1st?

Yes. InfraMap has NYISO day-ahead and real-time prices at 1 price node linked to North 1st, with the hub price and node-to-hub basis. Prices are free with an InfraMap account; pricing node names are part of InfraMap Pro.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • NYISO day-ahead and real-time prices; node and hub assignments as of 2026-10-05
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page