CoalOperatingCPLE

Roxboro

Coal power plant in Person County, North Carolina. 2,558.2 MW of nameplate capacity across 4 generators, operated by Duke Energy Progress - (NC).

Also known as Roxboro Steam Electric Plant · EIA plant 2712

Analyst: free account, 1 question a day.

Powells Creek Solar - HybridAlton Post Office SolarPerkins Solar, LLCWagstaff Farm 1Roxboro5 km
Open in the map
6 plants within 14 km, from EIA coordinates.

Key facts

Capacity
2,558.2 MWNameplate
Generators
4 operatingEIA-860M, August 2026
Operating since
May 1966First generator online
Operator
Duke Energy Progress - (NC)EIA operator ID 3046
Grid
CPLEBalancing authority CPLE
Price nodes
None linkedNo verified ISO node
Location
Person County, NC36.4833, −79.0731
EIA plant ID
2712EIA plant page

Data as of EIA-860M August 2026 (published 2026-09-24). Capacity is nameplate, not live output.

How much power Roxboro produces

Free · EIA-923

Net generation, 2025

6.97 TWh

6,968,944 MWh, final

Capacity factor, 2025

31.1%

2024: 30.2%

January to July 2026

4.09 TWh

Provisional

Range, 2015 to 2025

4.0–9.2

TWh a year. Low 2023, high 2015

Annual net generation, TWhCapacity factor below each year
Annual net generation from EIA-923
YearNet generation, MWhCapacity factorMonths reported
200015,216,565Not reported12 of 12
200114,636,011Not reported12 of 12
200214,291,038Not reported12 of 12
20039,854,015Not reported8 of 12
200414,924,017Not reported12 of 12
200514,799,903Not reported12 of 12
200615,082,569Not reported12 of 12
200715,506,915Not reported12 of 12
200815,272,104Not reported12 of 12
200915,024,877Not reported12 of 12
201015,979,26671.3%12 of 12
201111,792,10052.6%12 of 12
201213,962,98862.1%12 of 12
201310,447,08046.6%12 of 12
201412,804,92457.1%12 of 12
20159,248,99441.3%12 of 12
20168,312,05537.0%12 of 12
20176,008,26226.8%12 of 12
20185,927,87626.5%12 of 12
20196,947,06731.0%12 of 12
20205,259,59323.4%12 of 12
20215,519,13224.6%12 of 12
20225,460,05324.4%12 of 12
20234,040,82518.0%12 of 12
20246,775,23630.2%12 of 12
20256,968,94431.1%12 of 12
2026 (provisional, partial year)4,089,50031.4%7 of 7

* 2026 covers January to July and is provisional. Capacity factor is net generation divided by nameplate capacity times the hours of each reported month.

Power prices and basis

Free account

No verified ISO price node is linked to this plant, or its price history could not load.

Emissions

Free · EPA CAMPD

CO₂, 2025

7.69M

US short tons. 2024: 7.42M

SO₂, 2025

4,320

US short tons

NOx, 2025

7,027

US short tons

CO₂ per MWh, calculated

1.10 t

About 2,208 lb per MWh

6 of 6 EPA units reported CO₂ in 2025 (1, 2, 3A, 3B, 4A, 4B), matched to EIA plant 2712 through the EPA–EIA crosswalk. The per-MWh rate is EPA CO₂ divided by EIA-923 net generation. The two reporting boundaries can differ.

Water use

Free · EIA-923 cooling, USGS

Withdrawal, 2024

256,587

million gallons

Consumption, 2024

0

million gallons

Source

Hyco Lake (Hyco River)

Surface, Fresh. Once-through with cooling pond

Watershed stress

Low · 0.238

USGS SUI, HUC12 Cane Creek-Hyco Lake

48 of 48 cooling months report withdrawal. SUI of the source river HUC12 within 3 km. Cooling-pond plants report water circulated through the pond as withdrawal, so withdrawal is far above consumption. Blank volumes are unreported, not zero.

Generators

Free · EIA-860M
GeneratorTechnologyNameplate MWOnline since
1Conventional Steam Coal410.8May 1966
2Conventional Steam Coal657.0May 1968
3Conventional Steam Coal745.2July 1973
4Conventional Steam Coal745.2September 1980

Ownership and offtake

Pro
Pro

Ownership and offtake are part of Pro

Owners and their shares, parent companies, and power purchase agreements with their buyers. EIA-860M lists Duke Energy Progress - (NC) as the operator, which is not always the owner.

Modeled data

Pro

Pro adds modeled values for this plant. Everything above stays free.

Modeled

Generation potential vs reported

Monthly potential at seasonal net capability, next to EIA-923 output. Shows how much of the plant's capability was used.

Analyst and MCP

300 analyst questions a month, plus MCP

Query Roxboro and 14,224 other projects from Claude or your own tools. Free accounts get 1 question a day.

Power plants near Roxboro

More plants operated by Duke Energy Progress - (NC)

Questions about Roxboro

How much power does Roxboro produce?

Roxboro reported 6,968,944 MWh (6.97 TWh) of net generation in 2025, a 31.1% capacity factor on 2,558.2 MW of nameplate capacity. From January to July 2026 it reported 4.09 TWh, which is provisional.

Where is Roxboro?

Roxboro is in Person County, North Carolina, at 36.4833, −79.0731. It is in the Duke Energy Progress East balancing area (CPLE).

Who operates Roxboro?

EIA-860M for August 2026 lists Duke Energy Progress - (NC) as the operator (EIA operator ID 3046). The operator is not always the owner.

When did Roxboro start operating?

Its first generator began operating in May 1966, according to EIA-860M.

Sources

  • EIA-860 2025 (final) and EIA-860M August 2026: plant, generators, capacity, operator and location
  • EIA-923 monthly net generation, 2000 to July 2026 (2026 provisional)
  • EPA CAMPD annual emissions through the EPA–EIA crosswalk, 1995 to 2025
  • EIA-923 cooling water 2024 and the USGS surface water supply and use index, Water years 2010-2020 (Oct 2009 to Sep 2020), mean of monthly values
  • Plant names from OpenStreetMap, © OpenStreetMap contributors (ODbL)

Page updated 2026-10-04 from the InfraMap data build. Methodology · Data sources · EIA plant page